TEXAS · WELLS · ANDERSON COUNTY · API 42-001-30873 · DISTRICT 06

Killion, Maye et Al #1

Plugged

Anderson County  · Vertical

Killion, Maye ET AL #1 (API 42-001-30873) is a plugged well in Anderson County, plugged February 24, 1978, last operated by Davis Oil Company.

The RRC has issued one drilling permit, issued December 22, 1977, permitted to 11,687 ft.

Operator of record

Davis Oil Company

Based in
New Orleans, LA
P-5 status
Inactive (I)
P-5 last filed
Feb 12, 1988
Permits on file
281
Phone
(504) 581-4454

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitDavis Oil CompanyDec 22, 1977
11,687
total depth, ft
1
permits on file
Dec 22, 1977
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Feb 24, 1978

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
12873-99DrillDavis Oil CompanyDec 22, 1977Dec 22, 1977Dec 29, 197711,687

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00130873, documented in the API reference.