TEXAS · WELLS · ANDERSON COUNTY · API 42-001-31773 · DISTRICT 06
Johnston #1
Anderson County · Vertical
Johnston #1 (API 42-001-31773) is a plugged well in Anderson County, plugged January 31, 1987, last operated by Rowan, AL.
The RRC has issued one drilling permit, issued December 23, 1986, permitted to 6,000 ft.
Operator of record
- Based in
- Van, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Sep 2, 2020
- Permits on file
- 130
- Phone
- (903) 963-7496
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Rowan, AlDec 23, 1986 |
- 6,000
- total depth, ft
- 1
- permits on file
- Dec 23, 1986
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 31, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →
Permits
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-001-31773 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-001-31773 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00131773, documented in the API reference.