WELL · 42-001-32197 · DISTRICT 6

McFarland Trust #1

Shut in

Anderson County · Anwac (1300 Wilcox) field · Producing  · Vertical

Mcfarland Trust #1 (API 42-001-32197) is a well in Anderson County operated by Jla Resources Company, completed November 5, 1997 and listed as producing on the RRC schedule, shut in August 1, 2020.

The RRC has issued 3 drilling permits (amended once) between 1994 and 1997, permitted to 1,560 ft.

Completion filings report 2 formation tops, including Carrizo, Wilcox.

Its 2 leases have reported 83K barrels of oil and 10K mcf of gas since July 1996, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Jla Resources Company

Based in
Austin, TX
P-5 status
Active (A)
P-5 last filed
Feb 26, 2026
Permits on file
118
Phone
(903) 561-5558

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsJla Resources Companythrough Jan 2026
Latest permitJla Resources CompanyDec 12, 1997
1,560
total depth, ft
4
permits on file
Dec 12, 1997
last permit issued
Nov 5, 1997
completed
83K
cumulative oil, bbl
10K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 5, 1997
Shut in
Aug 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McFarland Trust O-6-13773Anwac (1300 Wilcox)Jla Resources Company178K9.44KNov 1997 – Jul 2026
McFarland Trustee et AL O-6-13620Anwac (1400 Wilcox)Jla Resources Company24.97K556Jul 1996 – Jun 1999

Oil, barrels lease total

Last 12 months 1,109 · prior 12 1,550(-28%)

050100150202420252026

Gas, mcf lease total

Last 12 months 130 · prior 12 185(-30%)

01020202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jla Resources CompanyJul 1996 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
471190-98RecompletionJla Resources CompanyFeb 25, 2011Dec 12, 1997Oct 30, 19971,600
471190-99RecompletionJla Resources CompanyDec 12, 1997Dec 12, 1997Oct 30, 19971,600
448434-99ReenterJla Resources CompanyMay 22, 1996May 30, 1996Jun 3, 19961,600
420208-99DrillBrowning Oil Company, Inc.Jan 14, 1994Jan 14, 1994Jan 21, 19945,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 5, 1997McFarland Trust O-6-13773Anwac (1300 Wilcox)Jla Resources CompanyProducing · shut in Aug 1, 20201,560
Jul 9, 1996McFarland Trustee et AL O-6-13620Anwac (1400 Wilcox)Jla Resources CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 392 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo575-183
Wilcox750-358
Wilcox1,090-698

Perforations

Perforated and open-hole intervals.

FromToType
1,3501,355Perforated
1,4101,415Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62558211200 S
4.51,5607.875325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 30, 1998Dec 15, 1997Yes
00Jan 21, 1998Nov 26, 1996Yes
00Apr 2, 1997Nov 26, 1996Yes
00Feb 27, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00132197, documented in the API reference.