WELL · 42-001-32264 · DISTRICT 6

Thornton #1

Shut in

Anderson County · Anwac (1400 Wilcox) field · Shut IN  · Vertical

Thornton #1 (API 42-001-32264) is a well in Anderson County operated by Jla Resources Company, completed November 24, 2003 and listed as shut in on the RRC schedule, shut in December 1, 2018.

The RRC has issued 2 drilling permits between 1997 and 2004, permitted to 1,550 ft.

Completion filings report 2 formation tops, including Carrizo, Wilcox.

Its 2 leases have reported 96.6K barrels of oil and 11.5K mcf of gas since October 1997, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Jla Resources Company

Based in
Austin, TX
P-5 status
Active (A)
P-5 last filed
Feb 26, 2026
Permits on file
118
Phone
(903) 561-5558

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJla Resources Company
Production reportsJla Resources Companythrough Jan 2026
Latest permitJla Resources CompanyFeb 5, 2004
1,550
total depth, ft
2
permits on file
Feb 5, 2004
last permit issued
Nov 24, 2003
completed
96.6K
cumulative oil, bbl
11.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 24, 2003
Shut in
Dec 1, 2018
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thornton O-6-14134Anwac (1400 Wilcox)Jla Resources Company381.5K9.7KDec 2001 – Jul 2026
Thornton O-6-13732Anwac (900 Wilcox)Jla Resources Company115.1K1.82KOct 1997 – Mar 2004

Oil, barrels lease total

Last 12 months 2,963 · prior 12 5,185(-43%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 345 · prior 12 627(-45%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jla Resources CompanyOct 1997 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
541698-99RecompletionJla Resources CompanyFeb 5, 2004Feb 5, 2004Nov 12, 20031,550
464116-99DrillJla Resources CompanyJun 23, 1997Jun 30, 1997Jul 9, 19971,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 24, 2003Thornton O-6-14134Anwac (1400 Wilcox)Jla Resources CompanyShut IN · shut in Dec 1, 20181,550
Oct 21, 1997Thornton O-6-13732Anwac (900 Wilcox)Jla Resources CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 424 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo585-161
Wilcox750-326

Perforations

Perforated and open-hole intervals.

FromToType
936942Perforated
1,5021,508Perforated
1,5121,516Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.51,5107.875270 S
5.51,5507.875270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 15, 2004Dec 11, 2003Yes
00Mar 8, 2004Nov 12, 1997Yes
00Feb 3, 1998Nov 12, 1997Yes
00Jan 2, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.62M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093496H-1 InjectionActive2,0007501,502–1,516

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00132264, documented in the API reference.