TEXAS · WELLS · ANDERSON COUNTY · TOOLE "A" LEASE · API 42-001-32389 · DISTRICT 06

Toole A #1

Plugged

Anderson County · Tennessee Colony (CV-Bossier) field  · Vertical

Toole A #1 (API 42-001-32389) is a plugged well in Anderson County, plugged October 29, 2012, last operated by Tgnr East Texas LLC.

The RRC has issued one drilling permit (amended once), issued June 21, 2002, permitted to 17,800 ft.

It was permitted by Anadarko Petroleum Corp. and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Massive Anhydrite (marker), Rodessa, Pettit, Travis Peak.

Its lease has reported 120 barrels of oil and 128K mcf of gas since November 2002, with no volume in the three years through April 2026.

Operator of record

TGNR East Texas LLC

Permitted by Anadarko Petroleum Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Sep 2012
Latest permitAnadarko Petroleum Corp.Jun 21, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,800
total depth, ft
2
permits on file
Jun 21, 2002
last permit issued
Nov 9, 2002
completed
120
cumulative oil, bbl
128K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2002 THROUGH Sep 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 9, 2002
Shut in
—
Plugged
Oct 29, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Toole "A" G-6-193072Tennessee Colony (CV-Bossier)TGNR East Texas LLC1120128KNov 2002 – Sep 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko Petroleum CorporationNov 2002 → Sep 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
521263-98DrillAnadarko Petroleum Corp.Nov 21, 2002Jun 21, 2002Aug 1, 200217,800
521263-99DrillAnadarko Petroleum Corp.Jun 21, 2002Jun 21, 2002—17,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 9, 2002Toole A G-6-193072Tennessee Colony (CV-Bossier)TGNR East Texas LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 25 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)MASSIVE ANHYDRITE8,896-8,871
Rodessa9,111-9,086
Pettit9,871-9,846
Travis Peak10,146-10,121
Cotton Valley13,271-13,246
Bossier16,021-15,996

Perforations

Perforated and open-hole intervals.

FromToType
16,07116,074Perforated
16,11216,116Perforated
16,14416,146Perforated
16,16116,167Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3755,40017.53,210 S
7.62515,9679.8751,600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 20, 2003Feb 26, 2003Yes
00Mar 6, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00132389, documented in the API reference.