WELL · 42-001-32422 · DISTRICT 6

Ware G. W. #24

Y

Anderson County · Cayuga (Woodbine) field · Producing  · Vertical

Ware G. W. #24 (API 42-001-32422) is a well in Anderson County operated by Mcgowan Working Partners Inc., completed June 5, 2003 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued April 23, 2003, permitted to 4,500 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Mcgowan Working Partners Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Pecan Gap, Taylor, Austin Chalk, Woodbine.

Its lease has reported 115K barrels of oil and 60.8K mcf of gas since June 2003, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

McGowan Working Partners Inc.

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Jackson, MS
P-5 status
Active (A)
P-5 last filed
Oct 27, 2025
Permits on file
60
Phone
(601) 982-3444

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcGowan Working Partners Inc.
Production reportsMcGowan Working Partners, Inc.through Apr 2026
Latest permitChevron U. S. A. Inc.Apr 23, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
2
permits on file
Apr 23, 2003
last permit issued
Jun 5, 2003
completed
115K
cumulative oil, bbl
60.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 5, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ware, G. W. O-6-14266Cayuga (Woodbine)McGowan Working Partners, Inc.2115K60.8KJun 2003 – Jul 2026

Oil, barrels lease total

Last 12 months 5,760 · prior 12 5,082(+13%)

05001K202420252026

Gas, mcf lease total

Last 12 months 4,901 · prior 12 5,424(-10%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jun 2003 → Aug 2017
  2. 2McGowan Working Partners, Inc.Sep 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
531039-98DrillChevron U. S. A. Inc.Aug 27, 2003Apr 23, 2003—4,500
531039-99DrillChevron U. S. A. Inc.Apr 23, 2003Apr 23, 2003May 16, 20034,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-14266————

Formation tops

As filed on W-2/G-1. Subsea from 314 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan GapPECAN GAP CHALK2,185-1,871
TaylorTAYLOR SHALE2,400-2,086
Austin Chalk3,263-2,949
Woodbine3,943-3,629

Perforations

Perforated and open-hole intervals.

FromToType
4,0094,014Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1660——
8.62571512.25375 S
5.54,1857.875720 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 10, 2003Jul 7, 2003Yes
00Nov 17, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00132422, documented in the API reference.