TEXAS · WELLS · ANDREWS COUNTY · PARKER, J. E., EST. ACCT. #2 LEASE · API 42-003-00643 · DISTRICT 7B
Parker J. E. Est. Acct. #2 #2
Andrews County · Nix South field · Producing · Vertical
Parker J. E. Est. Acct. #2 #2 (API 42-003-00643) is a permitted well in Andrews County filed by Bright & CO.; no completion report is on file yet.
The RRC has issued one drilling permit, issued March 19, 1980, permitted to 6,850 ft.
It was permitted by Bright & CO. and has since transferred to R3 Operating Corporation on the wellbore schedule.
Its lease has reported 23.5K barrels of oil and 842 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Bright & Co.; the EWA schedule now lists a different operator.
- Based in
- Greenwood VLG, CO
- P-5 status
- Active (A)
- P-5 last filed
- Sep 15, 2025
- Phone
- (720) 388-8270
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | R3 Operating Corporationthrough Apr 2026 |
| Latest permit | Bright & Co.Mar 19, 1980 |
- 6,850
- total depth, ft
- 1
- permits on file
- Mar 19, 1980
- last permit issued
- —
- completed
- 23.5K
- cumulative oil, bbl
- 842
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parker, J. E., Est. Acct. #2 O-10-12328 | Nix, South | R3 Operating Corporation | 1 | 23.5K | 842 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 211 · prior 12 195(+8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bright & Co.Jan 1993 → Feb 1996
- 2Butler, Kevin O. & Assoc., Inc.Mar 1996 → Sep 1999
- 3Hillside Oil & Gas, Inc.Oct 1999 → Nov 1999
- 4Hillside Oil & Gas LLCDec 1999 → Feb 2004
- 5Ipt Oil CompanyMar 2004 → Jul 2006
- 6Uhc Petroleum CorporationJan 2005 → Mar 2006
- 7Premier Natural Resources, L.P.Aug 2006 → Feb 2007
- 8Premier Natural Resources, LLCMar 2007 → Nov 2011
- 9Stanolind Operating LLCDec 2011 → Sep 2013
- 10Memorial Production Oper. LLCOct 2013 → Jan 2016
- 11Boaz Energy II Operating, LLCSep 2017 → Mar 2025
- 12T2 Operating CorporationApr 2025 → Jul 2025
- 13R3 Operating CorporationAug 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 75655-99 | Other | Bright & Co. | Mar 19, 1980 | Mar 19, 1980 | — | 7,076 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Parker J. E. Est. Acct. #2 O-10-12328 | Nix South | R3 Operating Corporation | Producing | 6,850 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| — | 6,850 | Perforated |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-003-00643 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-003-00643 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00300643, documented in the API reference.