TEXAS · WELLS · ANDREWS COUNTY · MEANS /SAN ANDRES/ UNIT LEASE · API 42-003-02314 · DISTRICT 7B

Means /San Andres/ Unit #1424

Shut in

Andrews County · Means field · Shut In  · Vertical

Means /San Andres/ Unit #1424 (API 42-003-02314) is a well in Andrews County operated by Hilcorp Energy Company, completed January 3, 2026 and listed as shut in on the RRC schedule, shut in November 1, 2023.

The RRC has issued 2 drilling permits between 1978 and 2015, permitted to 5,000 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including Yates, Seven Rivers, Queen, Grayburg.

Its lease has reported 89.6M barrels of oil and 52.4M mcf of gas since the record begins in January 1993, last reporting volume in August 2026. The lease carries 1,236 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Aug 2026
Latest permitXTO Energy Inc.Jul 27, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
2
permits on file
Jul 27, 2015
last permit issued
Jan 3, 2026
completed
89.6M
cumulative oil, bbl
52.4M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH AUG 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 3, 2026
Shut in
Nov 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 1,236 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Means /San Andres/ Unit O-10-17503MeansHilcorp Energy Company1,23689.6M52.4Mby Jan 1993 – Aug 2026

Oil, barrels lease total

Last 12 months 1,666,113 · prior 12 1,294,843(+29%)

0100K200K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 1,827(-100%)

05001K1.5K202420252026

Wells named Means /San Andres/ Unit

Hilcorp Energy Company's other wells filed under this lease name in Andrews County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2011
  3. 3XTO Energy Inc.Jan 2012 → Mar 2025
  4. 4Hilcorp Energy CompanyApr 2025 → Aug 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
807060-99RecompletionXTO Energy Inc.Jun 1, 2015Jul 27, 2015Nov 17, 20155,500
36670-99OtherExxon Corp.Nov 10, 1978Nov 10, 1978—4,510

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 3, 2026Means /San Andres/ Unit O-10-17503MeansHilcorp Energy CompanyShut In · shut in Nov 1, 20235,000
Jan 10, 2016Means /San Andres/ Unit O-10-17503MeansHilcorp Energy CompanyNot on Schedule—
Oct 17, 2014Means /San Andres/ Unit O-10-17503MeansHilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 3,141 ft elevation.Download CSV →

FormationMD ftSubsea
Yates2,945196
Seven Rivers3,12615
Queen3,760-619
Queen4,027-886
Grayburg4,088-947
Grayburg4,089-948
Grayburg4,220-1,079
San Andres4,395-1,254
San Andres4,397-1,256
San Andres4,398-1,257

Perforations

Perforated and open-hole intervals.

FromToType
4,4204,450Perforated
4,4364,630Perforated
4,4644,590Perforated
4,6504,875Perforated
4,6634,880Perforated
4,8214,880Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62527913.75200 S
5.54,4997.8751,780 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 4, 2026Jan 19, 2026—
00Feb 16, 2024Sep 27, 2023—
00Jan 7, 2022Dec 20, 2021—
00Jul 18, 2018Jun 18, 2018—
00Apr 7, 2016Mar 8, 2016—
00Mar 3, 2016Feb 4, 2016—
00Mar 4, 2015Dec 8, 2014—
00Dec 10, 2008Mar 25, 2008—
00Aug 31, 1994Jun 8, 1994—
00Jul 23, 1987Jul 7, 1987—
00Jun 30, 1986Jun 17, 1986—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
3.43M
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000018337H-1 InjectionActive6,0002,1504,300–5,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00302314, documented in the API reference.