WELL · 42-003-02587 · DISTRICT 8

Sims H. O. et AL #2

Shut in

Andrews County · Nelson (Ellenburger) field · Shut IN  · Vertical

Sims H. O. ET AL #2 (API 42-003-02587) is a well in Andrews County operated by Aghorn Operating Inc., completed January 3, 1984 and listed as shut in on the RRC schedule, shut in May 1, 2000.

The RRC has issued one drilling permit, issued September 29, 1983, permitted to 10,600 ft.

It was permitted by Young, Marshall R., Oil Company and has since transferred to Aghorn Operating Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Wichita-Albany, Ellenburger.

Its lease has reported 695 barrels of oil and 945 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Aghorn Operating Inc.

Permitted by Young, Marshall R., Oil Company; the EWA schedule now lists a different operator.

Based in
Odessa, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 1, 2026
Permits on file
5
Phone
(432) 550-0804

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleYoung Marshall R. Oil Co.
Production reportsSmith & Marrs Inc.through Aug 1999
Latest permitYoung, Marshall R., Oil CompanySep 29, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,600
total depth, ft
1
permits on file
Sep 29, 1983
last permit issued
Jan 3, 1984
completed
695
cumulative oil, bbl
945
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 3, 1984
Shut in
May 1, 2000
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sims, H. O. et AL O-10-4497Nelson (Ellenburger)Aghorn Operating, Inc.1695945Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Young, Marshall R., Oil Co.Jan 1993 → Sep 1993
  2. 2Smith & Marrs Inc.Aug 1998 → Aug 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
215375-99RecompletionYoung, Marshall R., Oil CompanyAug 30, 1983Sep 29, 1983—10,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 3, 1984Sims H. O. et AL O-10-4497Nelson (Ellenburger)Aghorn Operating Inc.Shut IN · shut in May 1, 200010,600
Apr 6, 1971Nelson (Wichita-Albany) Unit O-10-22625Nelson (Wichita)Aghorn Operating Inc.Not on Schedule—
—— O-10-4507Nelson (Wichita)Young Marshall R. Oil Co.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 3,376 ft elevation.Download CSV →

FormationMD ftSubsea
Wichita-Albany7,020-3,644
Ellenburger10,375-6,999

Perforations

Perforated and open-hole intervals.

FromToType
10,41510,460Perforated
10,46610,531Perforated
—7,373Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37541417.5450 S
9.6254,26812.252,900 S
5.510,5358.752,550 S
5.510,5368.752,550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 19, 1984Feb 29, 1984—
00Mar 8, 1984Feb 29, 1984—
00Jan 12, 1984Apr 20, 1971—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00302587, documented in the API reference.