WELL · 42-003-02982 · DISTRICT 8
Parker, J E #4W
Andrews County · Vertical
Parker, J E #4W (API 42-003-02982) is a disposal or injection well in Andrews County operated by Exxon Corp. under an active UIC permit.
The RRC has issued 2 drilling permits (amended 3 times) between 1994 and 1999, permitted to 8,946 ft.
Completion filings report 5 formation tops, including San Andres, Glorieta, Clear Fork, Tubb.
Its lease has reported 264K barrels of oil and 488K mcf of gas since January 1993, last reporting in July 2026. The lease carries 21 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit.
Operator of record
Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hilcorp Energy Companythrough Apr 2025 |
| Latest permit | Exxon Corp.Jul 13, 1999 |
- 8,946
- total depth, ft
- 5
- permits on file
- Jul 13, 1999
- last permit issued
- —
- completed
- 264K
- cumulative oil, bbl
- 488K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 21 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parker, J. E. O-10-4080 | Martin (McKee) | Hilcorp Energy Company | 21 | 264K | 488K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 9,074(-100%)
Oil, barrels lease total
Last 12 months 0 · prior 12 488(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Dec 2011
- 3XTO Energy Inc.Jan 2012 → Jul 2022
- 4Hilcorp Energy CompanyApr 2025 → Apr 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 485770-99 | Recompletion | Exxon Corp. | Jul 9, 1999 | Jul 13, 1999 | — | 7,200 |
| 427012-96 | Recompletion | Exxon Corp. | Sep 18, 1998 | Aug 17, 1994 | Dec 8, 1997 | 5,509 |
| 427012-97 | Recompletion | Exxon Corp. | Jan 15, 1998 | Aug 17, 1994 | — | 8,946 |
| 427012-98 | Recompletion | Exxon Corp. | Jun 11, 1996 | Aug 17, 1994 | — | 8,946 |
| 427012-99 | Recompletion | Exxon Corp. | Aug 15, 1994 | Aug 17, 1994 | — | 8,946 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-4080 | — | — | — | — |
| — | — O-10-4080 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,292 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 4,136 | -844 |
| GlorietaGLORIETTA | 5,185 | -1,893 |
| Clear ForkUPPER CLEARFORK | 5,514 | -2,222 |
| Tubb | 6,101 | -2,809 |
| Clear ForkLOWER CLEARFORK | 6,201 | -2,909 |
| Wichita-AlbanyWICHITA | 6,603 | -3,311 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,268 | 4,332 | Perforated |
| 4,420 | 4,500 | Perforated |
| 8,249 | 8,352 | Perforated |
| — | 8,352 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 466 | — | 400 S |
| 13.375 | 466 | 17.25 | 450 S |
| 9.625 | 4,124 | 12.25 | 3,500 S |
| 9.625 | 4,124 | — | 3,500 S |
| 5.5 | 8,946 | 8.75 | 850 S |
| 5.5 | 8,946 | — | 850 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 22, 2013 | Jul 3, 2012 | — |
| 00 | Apr 14, 1998 | Jan 29, 1998 | — |
| 00 | Nov 2, 1990 | Aug 24, 1990 | — |
| 00 | Oct 11, 1990 | Aug 5, 1985 | — |
| 00 | Mar 10, 1989 | Aug 5, 1985 | — |
| 00 | Feb 22, 1989 | — | — |
| 00 | Aug 26, 1985 | Aug 5, 1985 | — |
| 00 | Jan 12, 1984 | Apr 23, 1974 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-003-02982 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-003-02982 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 7.63M
- bbl, all reported
- Feb 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000052523 | H-1 Injection | Active | 3,000 | 2,075 | 4,150–5,260 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 596,107(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00302982, documented in the API reference.