TEXAS · WELLS · ANDREWS COUNTY · API 42-003-03720 · DISTRICT 7B
Peay Tom #1
Andrews County · Nolley (Wolfcamp) field · Vertical
Peay Tom #1 (API 42-003-03720) is a plugged well in Andrews County, plugged December 2, 1988, last operated by Crescent Energy Operating LLC.
The RRC has issued 2 drilling permits between 1986 and 1988, permitted to 14,000 ft.
It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Crescent Energy Operating LLC on the wellbore schedule.
Operator of record
Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 28, 2025
- Permits on file
- 54
- Phone
- (713) 337-4600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Crescent Energy Operating LLC |
| Production reports | none |
| Latest permit | Mobil Producing TX. & N.M. Inc.Jan 11, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 2
- permits on file
- Jan 11, 1988
- last permit issued
- Mar 30, 1988
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 30, 1988
- Shut in
- —
- Plugged
- Dec 2, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 341276-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jan 11, 1988 | Jan 11, 1988 | — | 14,000 |
| 322667-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Nov 3, 1986 | Nov 4, 1986 | — | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 30, 1988 | Peay Tom O-10-4533 | Nolley (Wolfcamp) | Crescent Energy Operating LLC | Plugged | — |
| — | Peay Tom O-10-4533 | Nolley (Wolfcamp) | Crescent Energy Operating LLC | Plugged | — |
| — | Peay Tom O-10-4533 | Nolley (Wolfcamp) | Crescent Energy Operating LLC | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,176 | 8,194 | Perforated |
| 9,227 | 9,300 | Perforated |
| — | 9,227 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 365 | — | 375 S |
| 9.625 | 5,192 | — | 400 S |
| 7.625 | 5,192 | — | 400 S |
| 2.375 | 9,136 | — | — |
| 7 | 9,309 | — | 1,425 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 9, 1988 | Apr 21, 1988 | Yes |
| 00 | Apr 6, 1988 | Mar 21, 1988 | — |
| 00 | Jan 12, 1984 | Aug 14, 1959 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-003-03720 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-003-03720 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.28M
- bbl, all reported
- Jun 1991
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000018973 | H-1 Injection | Plugged Jan 25, 1989 | 3,000 | 1,600 | 9,227–9,800 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00303720, documented in the API reference.