TEXAS · WELLS · ANDREWS COUNTY · C. W. LOGSDON -A- LEASE · API 42-003-37858 · DISTRICT 7B

C. W. Logsdon -A- #85

Shut in

Andrews County · Fullerton (San Andres) field · Shut In  · Vertical

C. W. Logsdon -A- #85 (API 42-003-37858) is a well in Andrews County operated by Hilcorp Energy Company, completed August 17, 1996 and listed as shut in on the RRC schedule, shut in August 1, 2002.

The RRC has issued one drilling permit, issued May 13, 1996, permitted to 4,800 ft.

It was permitted by Amoco Production Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Ogalalla, Santa Rosa, San Andres.

Its lease has reported 272K barrels of oil and 12K mcf of gas since January 1993, last reporting in July 2026. The lease carries 11 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Hilcorp Energy Company

Permitted by Amoco Production Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsOccidental Permian Ltd.through Apr 2026
Latest permitAmoco Production CompanyMay 13, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,800
total depth, ft
1
permits on file
May 13, 1996
last permit issued
Aug 17, 1996
completed
272K
cumulative oil, bbl
12K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 17, 1996
Shut in
Aug 1, 2002
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
C. W. Logsdon -A- O-10-30121Fullerton (San Andres)Hilcorp Energy Company11272K12KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 2,449 · prior 12 2,141(+14%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyJan 1993 → Feb 1997
  2. 2Altura Energy Ltd.Mar 1997 → Apr 2000
  3. 3Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
447876-99DrillAmoco Production CompanyMay 7, 1996May 13, 1996Jul 13, 19964,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 17, 1996C. W. Logsdon -A- O-10-30121Fullerton (San Andres)Hilcorp Energy CompanyShut In · shut in Aug 1, 20024,800

Formation tops

As filed on W-2/G-1. Subsea from 3,338 ft elevation.Download CSV →

FormationMD ftSubsea
Ogalalla3482,990
Santa Rosa1,3481,990
San Andres4,318-980

Perforations

Perforated and open-hole intervals.

FromToType
4,5424,562Perforated
4,5724,592Perforated
4,6024,622Perforated
4,6324,652Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62541312.25300 S
5.54,8007.8751,300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 3, 1996Sep 3, 1996Yes
00Sep 30, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
228K
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000084935H-1 InjectionActive1,0002,0004,200–5,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00337858, documented in the API reference.