WELL · 42-003-45450 · DISTRICT 8

Milan #2410

Y

Andrews County · Block a-34 (San Andres) field · Injection  · Vertical

Milan #2410 (API 42-003-45450) is a well in Andrews County operated by Parallel Petroleum LLC, completed August 25, 2013 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued June 13, 2013, permitted to 9,300 ft.

It was permitted by Forge Energy, LLC and has since transferred to Parallel Petroleum LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Yates, Seven Rivers, Queen, Grayburg.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 1.32M barrels injected in the 12 months reported through February 2026.

Operator of record

Parallel Petroleum LLC

Permitted by Forge Energy, LLC; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Oct 4, 2025 · 254 permits on file · (432) 238-9780

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleParallel Petroleum LLC
Production reportsnone
Latest permitForge Energy, LLCJun 13, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,300
total depth, ft
2
permits on file
Jun 13, 2013
last permit issued
Aug 25, 2013
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 25, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Milan O-10-45813Block a-34 (San Andres)Parallel Petroleum LLC100Aug 2013 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
763962-98DrillForge Energy, LLCJan 21, 2014Jun 13, 2013Jun 27, 20139,300
763962-99DrillForge Energy, LLCJun 4, 2013Jun 13, 2013Jun 27, 20139,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-45813————

Formation tops

As filed on W-2/G-1. Subsea from 3,231 ft elevation.Download CSV →

FormationMD ftSubsea
Yates3,032199
Seven Rivers3,232-1
Queen3,588-357
Grayburg4,365-1,134
GrayburgLOWER GRAYBURG4,606-1,375
San Andres4,733-1,502
GlorietaGLORIETTA5,940-2,709

Perforations

Perforated and open-hole intervals.

FromToType
5,4665,817Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,84412.25705 S
75,4688.751,195 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 3, 2015Feb 6, 2014—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.32M
bbl, last 12 reported months
6.16M
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108586H-1 InjectionActive12,5002,7005,440–5,960

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,317,046 · prior 12 1,715(+76696%)

0100K200K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00345450, documented in the API reference.