TEXAS · WELLS · ANGELINA COUNTY · MIMS JL GU LEASE · API 42-005-30374 · DISTRICT 06
Mims JL GU #1
Angelina County · Loco Bayou (James Lime) field · Producing · Horizontal
Mims JL GU #1 (API 42-005-30374) is a horizontal well in Angelina County operated by Atlas Operating LLC, completed February 11, 2009 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued October 29, 2008, permitted to 9,618 ft.
It was permitted by Goodrich Petroleum Company and has since transferred to Atlas Operating LLC on the wellbore schedule.
Completion filings report 7 formation tops, including Base Annona Ozan, Austin Chalk, Buda, Glen Rose.
Its lease has reported 126 barrels of oil and 1.71M mcf of gas since February 2009, last reporting volume in March 2026.
Operator of record
Permitted by Goodrich Petroleum Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Hearing (H)
- P-5 last filed
- Mar 9, 2026
- Permits on file
- 78
- Phone
- (281) 893-9400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Atlas Operating LLC |
| Production reports | Atlas Operating LLCthrough Mar 2026 |
| Latest permit | Goodrich Petroleum CompanyOct 29, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,618
- total depth, ft
- 1
- permits on file
- Oct 29, 2008
- last permit issued
- Feb 11, 2009
- completed
- 126
- cumulative oil, bbl
- 1.71M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2009 THROUGH Mar 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 11, 2009
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mims JL GU G-6-250014 | Loco Bayou (James Lime) | Atlas Operating LLC | 1 | 126 | 1.71M | Feb 2009 – Mar 2026 |
Gas, mcf lease total
Last 12 months 20,940 · prior 12 26,711(-22%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Goodrich Petroleum CompanyMar 2009 → Jun 2010
- 2SND Operating, L.L.C.Jul 2010 → Sep 2017
- 3Weatherly Oil & Gas, LLCOct 2017 → Mar 2019
- 4BRG Lone Star Ltd.Apr 2019 → Feb 2026
- 5Atlas Operating LLCMar 2026 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 673873-99 | Drill | Goodrich Petroleum Company | Oct 27, 2008 | Oct 29, 2008 | Dec 7, 2008 | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 11, 2009 | Mims JL GU G-6-250014 | Loco Bayou (James Lime) | Atlas Operating LLC | Producing | 9,618 |
Formation tops
As filed on W-2/G-1. Subsea from 268 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Annona Ozan | 5,389 | -5,121 |
| Austin Chalk | 5,839 | -5,571 |
| BudaBUDA LIME | 6,195 | -5,927 |
| Glen Rose | 7,388 | -7,120 |
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 8,873 | -8,605 |
| Pine Island | 9,294 | -9,026 |
| Bexar | 9,406 | -9,138 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,012 | 15,557 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,804 | 12.25 | 1,545 S |
| 7 | 9,803 | 9 | 703 S |
| 7 | 9,803 | 90 | 703 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 14, 2010 | Jan 25, 2010 | — |
| 00 | Sep 9, 2009 | May 20, 2009 | Yes |
| 00 | Aug 10, 2009 | — | — |
Well logs
2 logs loaded from the RRC's log index, the latest received May 14, 2013. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Base Annona Ozan, Austin Chalk, Buda, Glen Rose, Massive Anhydrite (marker), Pine Island, Bexar | TIFF | 3,794 to 9,587 | May 14, 2013run Dec 23, 2008 | 12.0 |
| COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Base Annona Ozan, Austin Chalk, Buda, Glen Rose, Massive Anhydrite (marker), Pine Island, Bexar | TIFF | 3,794 to 9,579 | Jan 30, 2012run Dec 23, 2008 | 4.44 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-005-30374 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-005-30374 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00530374, documented in the API reference.