TEXAS · WELLS · ARANSAS COUNTY · NINE MILE PT. FLD. CONSL. UNIT LEASE · API 42-007-30815 · DISTRICT 04
Nine Mile Pt. Fld. Consl. Unit #17ST
Aransas County · Nine Mile Point (Consol. Fld.) field · Temp Abandoned · Vertical
Nine Mile PT. Fld. Consl. Unit #17ST (API 42-007-30815) is a well in Aransas County operated by Lamar Oil & Gas Inc., completed October 30, 2010 and listed as temp abandoned on the RRC schedule, shut in August 1, 2024.
The RRC has issued 2 drilling permits between 1994 and 2005, permitted to 11,980 ft.
It was permitted by Eog Resources, Inc. and has since transferred to Lamar Oil & Gas Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including H-85, I-10, J-78.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.
- Based in
- Corpus Christ, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jan 10, 2025
- Permits on file
- 46
- Phone
- (361) 400-3050
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lamar Oil & Gas Inc. |
| Production reports | Lamar Oil & Gas, Inc.through Jul 2024 |
| Latest permit | EOG Resources, Inc.Nov 3, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,980
- total depth, ft
- 2
- permits on file
- Nov 3, 2005
- last permit issued
- Oct 30, 2010
- completed
- 0
- cumulative oil, bbl
- 994K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 30, 2010
- Shut in
- Aug 1, 2024
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nine Mile Pt. Fld. Consl. Unit G-4-151428 | Nine Mile Point (Consol. Fld.) | Lamar Oil & Gas, Inc. | 1 | 0 | 994K | Aug 1994 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 1,206(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Sep 1994 → Oct 1995
- 2EOG Resources, Inc.Jun 2006 → Jan 2011
- 3Goldking Onshore Operating, LLCFeb 2011 → Feb 2015
- 4Lamar Oil & Gas, Inc.Mar 2015 → Jul 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 608861-99 | Recompletion | EOG Resources, Inc. | Nov 2, 2005 | Nov 3, 2005 | — | 12,300 |
| 423705-99 | Drill | Exxon Corp. | May 6, 1994 | May 6, 1994 | Jun 14, 1994 | 12,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 30, 2010 | Nine Mile Pt. Fld. Consl. Unit G-4-151428 | Nine Mile Point (Consol. Fld.) | Lamar Oil & Gas Inc. | Temp Abandoned · shut in Aug 1, 2024 | 11,980 |
Formation tops
As filed on W-2/G-1. Subsea from 37 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| H-85 | 7,832 | -7,795 |
| I-10 | 8,063 | -8,026 |
| J-78 | 9,835 | -9,798 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,530 | 10,550 | Perforated |
| 11,495 | 11,766 | Perforated |
| 11,650 | 11,676 | Perforated |
| 11,650 | 11,770 | Perforated |
| 11,703 | 11,730 | Perforated |
| 11,730 | 11,770 | Perforated |
| 11,750 | 11,770 | Perforated |
| 77,103 | 11,730 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7.75 | 92 | 9.875 | 625 S |
| 7.75 | 93 | 9.875 | 625 S |
| 10.75 | 1,975 | 14.75 | 1,300 S |
| 3.5 | 8,480 | — | — |
| 7.75 | 9,274 | 9.875 | 625 S |
| 2.875 | 11,835 | 4.125 | 80 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 2, 2011 | Jan 12, 2011 | — |
| 00 | Mar 9, 2007 | Jul 18, 2006 | — |
| 00 | May 4, 1995 | Mar 23, 1995 | — |
| 00 | Mar 29, 1995 | Mar 13, 1995 | — |
| 00 | Mar 28, 1995 | Feb 8, 1995 | — |
| 00 | Nov 15, 1994 | Oct 20, 1994 | Yes |
| 00 | Oct 27, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-007-30815 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-007-30815 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00730815, documented in the API reference.