WELL · 42-009-38758 · DISTRICT 9

Staley-Mangold Unit #121

Y

Archer County · K-M-A field · Producing  · Vertical

Staley-Mangold Unit #121 (API 42-009-38758) is a well in Archer County operated by Stephens & Johnson Operating CO., completed December 21, 1984 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 14, 1984, permitted to 3,955 ft.

It was permitted by American Petrofina CO. Of Tex. and has since transferred to Stephens & Johnson Operating CO. on the wellbore schedule.

Completion filings report 4 formation tops, including Kma Lime, Kma Zone I, Kma Zone Ii, Caddo.

Its lease has reported 1.99M barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The lease carries 91 wells, so these are lease totals, not this well alone.

Operator of record

Stephens & Johnson Operating Co.

Permitted by American Petrofina Co. of Tex.; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2026
Latest permitAmerican Petrofina Co. of Tex.Sep 14, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,955
total depth, ft
1
permits on file
Sep 14, 1984
last permit issued
Dec 21, 1984
completed
1.99M
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 21, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 91 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Staley-Mangold Unit O-13-12565K-M-AStephens & Johnson Operating Co.911.99M19Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 26,755 · prior 12 30,136(-11%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1S & J Operating Co.Jan 1993 → Aug 1993
  2. 2Stephens & Johnson Operating Co.Sep 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
251519-99DrillAmerican Petrofina Co. of Tex.Sep 18, 1984Sep 14, 1984Oct 29, 19843,950

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 21, 1984Staley-Mangold Unit O-13-12565K-M-AStephens & Johnson Operating Co.Producing3,955

Formation tops

As filed on W-2/G-1. Subsea from 1,018 ft elevation.Download CSV →

FormationMD ftSubsea
Kma Lime3,689-2,671
Kma Zone I3,758-2,740
Kma Zone II3,798-2,780
Caddo3,911-2,893

Perforations

Perforated and open-hole intervals.

FromToType
3,8003,850Perforated
3,8603,888Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513812.5100 S
5.53,9547.875230 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 13, 1985Jan 17, 1985—
00Feb 1, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00938758, documented in the API reference.