WELL · 42-009-39904 · DISTRICT 9

Coleman Mobley Unit #4

Plugged

Archer County · Three-T (Mobley) field  · Vertical

Coleman Mobley Unit #4 (API 42-009-39904) is a plugged well in Archer County, plugged April 26, 2011, last operated by 3-T Exploration Inc..

The RRC has issued 2 drilling permits between 1988 and 1989, permitted to 6,100 ft.

Completion filings report 3 formation tops, including Mobley, Caddo, Ellenburger.

Its lease has reported 177K barrels of oil and 21 mcf of gas since January 1993, last reporting in January 2021. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

3-T Exploration Inc.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Apr 7, 2026
Permits on file
219
Phone
(940) 691-5091

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedule3-T Exploration Inc.
Production reports3-T Exploration, Inc.through Apr 2020
Latest permit3-T Exploration, Inc.May 19, 1989
6,100
total depth, ft
2
permits on file
May 19, 1989
last permit issued
Mar 22, 1989
completed
177K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 22, 1989
Shut in
—
Plugged
Apr 26, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Coleman Mobley Unit O-13-27099Three-T (Mobley)3-T Exploration, Inc.5177K21Jan 1993 – Jan 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 13-T Exploration, Inc.Jan 1993 → Apr 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
359425-99Recompletion3-T Exploration, Inc.May 17, 1989May 19, 1989—6,026
342705-99Drill3-T Exploration, Inc.Feb 16, 1988Feb 17, 1988—6,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 22, 1989Coleman Mobley Unit O-13-27099Three-T (Mobley)3-T Exploration Inc.Plugged—
May 11, 1988Coleman O-13-26533Scaling Ranch S (Ellen)3-T Exploration Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 9,272 ft elevation.Download CSV →

FormationMD ftSubsea
Mobley4,1965,076
Caddo5,3003,972
Caddo5,3603,912
EllenburgerELLENBERGER5,8803,392
Ellenburger6,1003,172

Perforations

Perforated and open-hole intervals.

FromToType
4,1964,210Perforated
5,8925,902Perforated
5,9125,920Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521212.25135 S
4.56,0257.875560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 16, 1989May 12, 1989Yes
00Jun 14, 1989——
00Jun 22, 1988May 18, 1988Yes
00Jun 3, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.42M
bbl, all reported
Jan 2012
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079268H-1 InjectionPlugged May 3, 20118501,2004,196–4,210

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 33,499(-100%)

02K4K6K20112012

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00939904, documented in the API reference.