TEXAS · WELLS · ARCHER COUNTY · PARKEY A LEASE · API 42-009-40098 · DISTRICT 7C

Parkey A #1

Y

Archer County · Archer County Regular field · Producing  · Vertical

Parkey A #1 (API 42-009-40098) is a well in Archer County operated by DM Backhoe Service, completed September 15, 1989 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 21, 1989, permitted to 1,780 ft.

It was permitted by Villa Petroleum, Inc. and has since transferred to DM Backhoe Service on the wellbore schedule.

Completion filings report one formation top, including Gunsite Sand.

Its lease has reported 14.1K barrels of oil and 49 mcf of gas since January 1993, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

DM Backhoe Service

Permitted by Villa Petroleum, Inc.; the EWA schedule now lists a different operator.

Based in
Graham, TX
P-5 status
Active (A)
P-5 last filed
Aug 13, 2025
Phone
(940) 549-0131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDM Backhoe Service
Production reportsDM Backhoe Servicethrough Apr 2026
Latest permitVilla Petroleum, Inc.Jun 21, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,780
total depth, ft
1
permits on file
Jun 21, 1989
last permit issued
Sep 15, 1989
completed
14.1K
cumulative oil, bbl
49
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 15, 1989
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parkey A O-13-27535Archer County RegularDM Backhoe Service1014.1K49Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 295 · prior 12 259(+14%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Equitable Energy, Inc. (I)Jan 1993 → Apr 1993
  2. 2H & H ProductionJun 1993 → Apr 2005
  3. 3Pautsky, JimmyJun 2008 → Sep 2012
  4. 4Pautsky, Jimmy Estate OfOct 2012 → Jun 2020
  5. 5Hulcy, DustyNov 2021 → Feb 2024
  6. 6Akins Oil CompanyJan 2025 → Mar 2025
  7. 7DM Backhoe ServiceApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
360527-99DrillVilla Petroleum, Inc.Jun 19, 1989Jun 21, 1989—1,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 15, 1989Parkey A O-13-27535Archer County RegularDM Backhoe ServiceProducing1,780

Formation tops

As filed on W-2/G-1. Subsea from 1,058 ft elevation.Download CSV →

FormationMD ftSubsea
Gunsite Sand1,734-676

Perforations

Perforated and open-hole intervals.

FromToType
1,7321,734Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.51,7707.875280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 6, 1989Oct 4, 1989Yes
00Oct 24, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940098, documented in the API reference.