TEXAS · WELLS · ARCHER COUNTY · CLIMAX LEASE · API 42-009-40392 · DISTRICT 7C

Climax #8L

Plugged

Archer County · Archer County Regular field  · Vertical

Climax #8L (API 42-009-40392) is a plugged well in Archer County, plugged May 9, 2017, last operated by Lmh Energy.

The RRC has issued one drilling permit, issued December 18, 1990, permitted to 1,600 ft.

It was permitted by Landrum West, Inc. and has since transferred to Lmh Energy on the wellbore schedule.

Completion filings report 3 formation tops, including Thomas Sand, Gunsite Lime, Gunsite Broken Oil Sd..

Its lease has reported 127K barrels of oil and 21 mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 60 wells, so these are lease totals, not this well alone.

Operator of record

LMH Energy

Permitted by Landrum West, Inc.; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
May 27, 2026
Permits on file
59
Phone
(940) 642-4287

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLMH Energy
Production reportsLMH Energythrough Apr 2026
Latest permitLandrum West, Inc.Dec 18, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,600
total depth, ft
1
permits on file
Dec 18, 1990
last permit issued
Jan 8, 1991
completed
127K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 8, 1991
Shut in
—
Plugged
May 9, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 60 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Climax O-13-525Archer County RegularLMH Energy60127K21Jan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 2,911 · prior 12 2,896(+1%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Landrum West, Inc.Jan 1993 → Nov 1993
  2. 2Century Resources, Inc.Dec 1993 → Feb 1995
  3. 3Springfield Oil Services, Inc.Mar 1995 → Jun 2015
  4. 4American Petroleum Corp.Jul 2006 → Nov 2008
  5. 5Hoco, Inc.Mar 2016 → Aug 2022
  6. 6LMH EnergySep 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
382352-99DrillLandrum West, Inc.Dec 13, 1990Dec 18, 1990Dec 15, 19901,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 8, 1991Climax O-13-525Archer County RegularLMH EnergyPlugged—

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Thomas SandTHOMAS WEST1,270
Gunsite Lime1,388
Gunsite Broken Oil Sd.1,407

Perforations

Perforated and open-hole intervals.

FromToType
1,4071,432Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.51,5007.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 30, 1991Feb 15, 1991Yes
00Apr 12, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940392, documented in the API reference.