WELL · 42-009-40818 · DISTRICT 9

Kunkel Unit #1

Plugged

Archer County · Megargel NE. (Miss) field  · Vertical

Kunkel Unit #1 (API 42-009-40818) is a plugged well in Archer County, plugged June 19, 1997, last operated by Echo Production Inc..

The RRC has issued one drilling permit, issued December 15, 1993, permitted to 5,200 ft.

Completion filings report 2 formation tops, including Caddo, Mississippian.

Its lease has reported 12.3K barrels of oil and 9 mcf of gas since January 1994, last reporting in September 1997.

Operator of record

Echo Production Inc.

Based in
Graham, TX
P-5 status
Delinquent (D)
P-5 last filed
Mar 5, 2025
Permits on file
296
Phone
(940) 549-3292

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEcho Production Inc.
Production reportsEcho Production, Inc.through Jun 1997
Latest permitEcho Production, Inc.Dec 15, 1993
5,200
total depth, ft
1
permits on file
Dec 15, 1993
last permit issued
Jan 3, 1994
completed
12.3K
cumulative oil, bbl
9
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1994 THROUGH Sep 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 3, 1994
Shut in
—
Plugged
Jun 19, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kunkel Unit O-13-28713Megargel, NE. (Miss)Echo Production, Inc.112.3K9Jan 1994 – Sep 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Echo Production, Inc.Jan 1994 → Jun 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
418884-99DrillEcho Production, Inc.Dec 13, 1993Dec 15, 1993Dec 21, 19935,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-28713————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Caddo4,730
MississippianMISSISSIPPI5,026

Perforations

Perforated and open-hole intervals.

FromToType
5,0325,043Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62514612.2590 S
4.55,0497.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 9, 1994Jan 26, 1994Yes
00Jan 31, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940818, documented in the API reference.