WELL · 42-009-41875 · DISTRICT 9
Parish Jr. #6S
Archer County · Parish (1350) field · Vertical
Parish JR. #6S (API 42-009-41875) is a plugged well in Archer County, plugged November 18, 2014, last operated by R2q Operating LLC.
The RRC has issued one drilling permit, issued September 2, 2008, permitted to 2,000 ft.
It was permitted by Texas Energy Operations, LC and has since transferred to R2q Operating LLC on the wellbore schedule.
Completion filings report one formation top, including Perman.
Its lease has reported 15.1K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Texas Energy Operations, LC; the EWA schedule now lists a different operator.
- Based in
- Iowa Park, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Sep 12, 2025
- Permits on file
- 38
- Phone
- (940) 228-1500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | R2Q Operating LLC |
| Production reports | Texas Energy Operations, LCthrough Apr 2016 |
| Latest permit | Texas Energy Operations, LCSep 2, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Sep 2, 2008
- last permit issued
- Oct 22, 2008
- completed
- 15.1K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 22, 2008
- Shut in
- —
- Plugged
- Nov 18, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parish, Jr. O-13-18433 | Parish (1350) | R2Q Operating LLC | 6 | 15.1K | 21 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Finnell Oil Co.Jan 1993 → Oct 1996
- 2Finnell Oil Services, Inc.Nov 1996 → Sep 2000
- 3Sissom OilJun 2005 → Dec 2007
- 4Texas Energy Operations, LCJan 2008 → Apr 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 668843-99 | Drill | Texas Energy Operations, LC | Aug 12, 2008 | Sep 2, 2008 | Oct 6, 2008 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-18433 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,190 | 1,196 | Perforated |
| 1,378 | 1,386 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 114 | 12.25 | 80 S |
| 4.5 | 1,600 | 6.75 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 16, 2009 | Feb 2, 2009 | Yes |
| 00 | May 21, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-41875 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-41875 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00941875, documented in the API reference.