TEXAS · WELLS · ARCHER COUNTY · DAYTON EAST LEASE · API 42-009-42053 · DISTRICT 7C
Dayton East #5
Archer County · Bobcat Bluff (Missippian) field · Shut In · Vertical
Dayton East #5 (API 42-009-42053) is a well in Archer County operated by Stovall Operating CO., completed October 28, 2009 and listed as shut in on the RRC schedule, shut in February 1, 2023.
The RRC has issued one drilling permit, issued September 8, 2009, permitted to 5,181 ft.
Completion filings report 3 formation tops, including Gunsite Lm, Caddo, Mississippian.
Its lease has reported 9.85K barrels of oil since October 2009, last reporting in July 2026.
Operator of record
- Based in
- Graham, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 25, 2025
- Permits on file
- 259
- Phone
- (940) 549-2616
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stovall Operating Co. |
| Production reports | Stovall Operating Co.through Aug 2022 |
| Latest permit | Stovall Operating Co.Sep 8, 2009 |
- 5,181
- total depth, ft
- 1
- permits on file
- Sep 8, 2009
- last permit issued
- Oct 28, 2009
- completed
- 9.85K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 28, 2009
- Shut in
- Feb 1, 2023
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dayton East O-13-31492 | Bobcat Bluff (Missippian) | Stovall Operating Co. | 1 | 9.85K | 0 | Oct 2009 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stovall Operating Co.Oct 2009 → Aug 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 684643-99 | Drill | Stovall Operating Co. | Aug 31, 2009 | Sep 8, 2009 | Sep 17, 2009 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 28, 2009 | Dayton East O-13-31492 | Bobcat Bluff (Missippian) | Stovall Operating Co. | Shut In · shut in Feb 1, 2023 | 5,181 |
Formation tops
As filed on W-2/G-1. Subsea from 1,130 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gunsite LM | 1,125 | 5 |
| CaddoCADDO LM | 4,682 | -3,552 |
| MississippianTOP MISSISSIPPI LM | 5,176 | -4,046 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,176 | 5,181 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 160 | 12.25 | 120 S |
| 4.5 | 5,176 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 17, 2010 | Nov 3, 2009 | Yes |
| 00 | Feb 3, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-42053 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-42053 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00942053, documented in the API reference.