WELL · 42-009-42298 · DISTRICT 9
Wilson SPR #1
Archer County · Hull-Silk-Sikes (Caddo) field · Producing · Vertical
Wilson Spr #1 (API 42-009-42298) is a well in Archer County operated by Gunn Oil Company, completed April 27, 2012 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 2011 and 2012, permitted to 5,400 ft.
Completion filings report 5 formation tops, including Canyon, Strawn, Kma Lime, Caddo.
Its 2 leases have reported 82.1K barrels of oil since May 2011, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed Feb 4, 2026 · 743 permits on file · (940) 256-3330
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gunn Oil Company |
| Production reports | Gunn Oil Companythrough Apr 2026 |
| Latest permit | Gunn Oil CompanyOct 11, 2012 |
- 5,400
- total depth, ft
- 2
- permits on file
- Oct 11, 2012
- last permit issued
- Apr 27, 2012
- completed
- 82.1K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 27, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wilson SPR O-13-31899 | Hull-Silk-Sikes (Ellen) | Gunn Oil Company | 1 | 22.7K | 0 | May 2011 – Jul 2026 |
| Wilson SPR O-13-32232 | Hull-Silk-Sikes (Caddo) | Gunn Oil Company | 2 | 59.4K | 0 | Jan 2012 – Jul 2026 |
Oil, barrels lease total
Last 12 months 3,105 · prior 12 3,295(-6%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gunn Oil CompanyMay 2011 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 748881-99 | Recompletion | Gunn Oil Company | Sep 26, 2012 | Oct 11, 2012 | Apr 25, 2012 | 5,295 |
| 713305-99 | Drill | Gunn Oil Company | Mar 31, 2011 | Apr 5, 2011 | Apr 18, 2011 | 5,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31899 | — | — | — | — |
| — | — O-13-32232 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,016 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 2,146 | -1,130 |
| Strawn | 3,638 | -2,622 |
| Kma Lime | 3,932 | -2,916 |
| Caddo | 4,520 | -3,504 |
| Ellenburger | 4,868 | -3,852 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,522 | 4,531 | Perforated |
| 4,604 | 4,620 | Perforated |
| 4,920 | 4,945 | Perforated |
| 4,920 | 4,956 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 138 | 12.25 | 125 S |
| 4.5 | 5,001 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 15, 2014 | May 31, 2012 | — |
| 00 | Nov 14, 2011 | Jun 3, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-42298 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-42298 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00942298, documented in the API reference.