WELL · 42-009-42871 · DISTRICT 9

Monohan E. S. #3G

N

Archer County · Archer County Regular field  · Vertical

Monohan E. S. #3G (API 42-009-42871) is a well in Archer County operated by Gilliam Partners L.P., completed January 25, 2015.

The RRC has issued one drilling permit, issued January 21, 2015, permitted to 2,000 ft.

Completion filings report 10 formation tops, including Thomas Sand, Gunsight, Bryson, Canyon.

Its 2 leases have reported 2.66K barrels of oil and 78 mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Gilliam Partners L.P.

Dallas, TX · P-5 Y, filed Sep 6, 2019 · 12 permits on file · (806) 239-4787

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGilliam Partners L.P.
Production reportsGilliam Partners, L.P.through Mar 2017
Latest permitGilliam Partners, L.P.Jan 21, 2015
2,000
total depth, ft
1
permits on file
Jan 21, 2015
last permit issued
Jan 25, 2015
completed
2.66K
cumulative oil, bbl
78
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 25, 2015
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Monohan, E. S. O-13-333Archer County RegularGilliam Partners, L.P.72.66K78Jan 1993 – Jul 2026
Monahan, E. S. 'A' O-13-33835Archer County RegularPalmer, John LLC100Mar 2018 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crutcher Oil PropertiesJan 1993 → Aug 1996
  2. 2B.E.G. ProductionSep 1996 → Feb 1999
  3. 3Estacado Energy, LLCApr 2002 → Nov 2007
  4. 4AG Operating Company LLCFeb 2008 → Feb 2009
  5. 5Utility Ventures CompanyNov 2010 → Feb 2012
  6. 6Gilliam Partners, L.P.Jan 2015 → Mar 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
802840-99DrillGilliam Partners, L.P.Jan 16, 2015Jan 21, 2015Jan 23, 20152,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-333————
—— O-13-33835————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Thomas Sand1,100
Gunsight1,300
Gunsight1,312
BrysonBRYSON SAND—
Canyon—
Cisco—
Davidson—
Delmar—
Megargel—
StrawnSTRAWN SAND—
Thomas Sand—
Ward Sand—

Perforations

Perforated and open-hole intervals.

FromToType
1,3141,324Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.87510012.25100 S
8.62510012.25100 S
4.51,9996.75300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 15, 2023Jan 26, 2022—
00Feb 6, 2019Feb 24, 2017—
00Mar 9, 2017Feb 24, 2017—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
15.4K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000113111H-1 InjectionActive5006501,314–1,324

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00942871, documented in the API reference.