TEXAS · WELLS · ATASCOSA COUNTY · KITCHEN, GEORGE R. LEASE · API 42-013-01883 · DISTRICT 01
Kitchen George R. #2
Atascosa County · Jourdanton field · Vertical
Kitchen George R. #2 (API 42-013-01883) is a plugged well in Atascosa County, plugged May 17, 1993, last operated by Amoco Production Company.
The RRC has issued one drilling permit (amended once), issued May 4, 1992, permitted to 7,373 ft.
Its lease has reported 1 barrels of oil and 333 mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jun 29, 2015
- Permits on file
- 7,201
- Phone
- (281) 366-7061
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Amoco Production Company |
| Production reports | Amoco Production Companythrough Jan 1993 |
| Latest permit | Amoco Production CompanyMay 4, 1992 |
- 7,373
- total depth, ft
- 2
- permits on file
- May 4, 1992
- last permit issued
- —
- completed
- 1
- cumulative oil, bbl
- 333
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- May 17, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kitchen, George R. O-1-752 | Jourdanton | Amoco Production Company | 2 | 1 | 333 | Jan 1993 – Jan 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Amoco Production CompanyJan 1993 → Jan 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 398720-98 | Recompletion | Amoco Production Company | Jun 25, 1992 | May 4, 1992 | — | 7,373 |
| 398720-99 | Recompletion | Amoco Production Company | Apr 24, 1992 | May 4, 1992 | — | 7,373 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Kitchen George R. O-1-752 | Jourdanton | Amoco Production Company | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,350 | 7,360 | Perforated |
| 7,365 | 7,373 | Perforated |
| — | 7,354 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,518 | — | 1,200 S |
| 5.5 | 7,365 | — | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 23, 1991 | Sep 26, 1991 | — |
| 00 | Mar 25, 1991 | Mar 8, 1991 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-013-01883 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-013-01883 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01301883, documented in the API reference.