WELL · 42-013-31468 · DISTRICT 1

James #1

Plugged

Atascosa County · Zepeda (Austin Chalk) field  · Vertical

James #1 (API 42-013-31468) is a plugged well in Atascosa County, plugged April 27, 1984, last operated by Santa FE - Windsor Producing CO..

The RRC has issued one drilling permit, issued April 28, 1982, permitted to 12,000 ft.

Operator of record

Santa FE - Windsor Producing Co.

Based in
Giddings, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 2, 1983
Permits on file
127
Phone
(409) 542-9531

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSanta FE - Windsor Producing Co.
Production reportsnone
Latest permitSanta FE - Windsor Producing Co.Apr 28, 1982
12,000
total depth, ft
1
permits on file
Apr 28, 1982
last permit issued
Feb 23, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 23, 1983
Shut in
—
Plugged
Apr 27, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
158493-99DrillSanta FE - Windsor Producing Co.Apr 28, 1982Apr 28, 1982Oct 19, 198212,000

Perforations

Perforated and open-hole intervals.

FromToType
7,6887,846Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,68212.251,265 S
2.3757,712——
5.58,1798.75500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 27, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000110117W-14 DisposalCanceled Jan 26, 201717,5004,0958,190–8,900

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01331468, documented in the API reference.