TEXAS · WELLS · ATASCOSA COUNTY · SMITH-EHLINGER LEASE · API 42-013-32616 · DISTRICT 01

Smith-Ehlinger #6

Plugged

Atascosa County · Kyote field  · Vertical

Smith-Ehlinger #6 (API 42-013-32616) is a plugged well in Atascosa County, plugged August 3, 1990, last operated by Ginco Operating CO..

The RRC has issued one drilling permit, issued March 15, 1984, permitted to 3,500 ft.

It was permitted by Atasco, Inc. and has since transferred to Ginco Operating CO. on the wellbore schedule.

Its lease has reported 310 barrels of oil and 18 mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

Ginco Operating Co.

Permitted by Atasco, Inc.; the EWA schedule now lists a different operator.

Based in
San Antonio, TX
P-5 status
Delinquent (D)
P-5 last filed
Feb 15, 1995
Permits on file
4
Phone
(210) 599-2629

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGinco Operating Co.
Production reportsGinco Operating Co.through Oct 1995
Latest permitAtasco, Inc.Mar 15, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
Mar 15, 1984
last permit issued
Jun 14, 1984
completed
310
cumulative oil, bbl
18
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 14, 1984
Shut in
—
Plugged
Aug 3, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith-Ehlinger O-1-9392KyoteGinco Operating Co.1031018Jan 1993 – Oct 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ginco Operating Co.Jan 1993 → Oct 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
232441-99DrillAtasco, Inc.Mar 14, 1984Mar 15, 1984—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 14, 1984Smith-Ehlinger O-1-9392KyoteGinco Operating Co.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
3,1213,128Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515012.2562 sx
4.53,1977.875564 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 5, 1984Aug 23, 1984—
00Sep 1, 1984Aug 23, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01332616, documented in the API reference.