TEXAS · WELLS · ATASCOSA COUNTY · API 42-013-33384 · DISTRICT 01
J. Henderson et al GU #1 #3
Atascosa County · Wildcat field · Temp Abandoned · Horizontal · Sidetrack
J. Henderson ET AL GU #1 #3 (API 42-013-33384) is a horizontal well in Atascosa County operated by Xto Energy Inc., completed May 22, 1999 and listed as temp abandoned on the RRC schedule, shut in January 1, 1999.
The RRC has issued 2 drilling permits between 1985 and 1999, permitted to 14,080 ft.
It was permitted by Chevron U. S. A. Inc. and has since transferred to Xto Energy Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Austin Chalk, Buda, Georgetown, Edwards.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | Chevron U. S. A. Inc.through Feb 1998 |
| Latest permit | Chevron U. S. A. Inc.Feb 3, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,080
- total depth, ft
- 2
- permits on file
- Feb 3, 1999
- last permit issued
- May 22, 1999
- completed
- 0
- cumulative oil, bbl
- 2.64M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 22, 1999
- Shut in
- Jan 1, 1999
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| J. Henderson et al GU #1 G-1-174590 | Wildcat | XTO Energy Inc. | 1 | 0 | 0 | May 1999 – Jul 2026 |
| Henderson, J. et al GU 1 G-1-118708 | Fashing (Edwards Lime -A-) | Chevron U. S. A. Inc. | 1 | 0 | 2.64M | Jan 1993 – May 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 1993 → Feb 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 482434-99 | Drill · sidetrack | Chevron U. S. A. Inc. | Feb 3, 1999 | Feb 3, 1999 | Mar 12, 1999 | 11,300 |
| 276143-99 | Drill | Gulf Oil Corp. | Apr 10, 1985 | May 28, 1985 | — | 10,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 22, 1999 | J. Henderson et al GU #1 G-1-174590 | Wildcat | XTO Energy Inc. | Temp Abandoned · shut in Jan 1, 1999 | 14,080 |
| May 29, 1998 | Henderson J. et al GU 1 G-1-118708 | Fashing (Edwards Lime -A-) | Chevron U. S. A. Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 475 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 9,680 | -9,205 |
| Austin Chalk | 9,782 | -9,307 |
| Buda | 10,224 | -9,749 |
| Georgetown | 10,340 | -9,865 |
| EdwardsEDWARDS 'A' | 10,468 | -9,993 |
| EdwardsEDWARDS 'B' | 10,712 | -10,237 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,475 | 10,506 | Perforated |
| 10,550 | 10,566 | Perforated |
| 10,570 | 10,582 | Perforated |
| 10,586 | 10,610 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,091 | 14.75 | 900 S |
| 7.625 | 10,999 | 8.875 | 2,380 S |
| 7.625 | 10,999 | 9.875 | 2,380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 22, 1999 | Sep 29, 1999 | Yes |
| 00 | Nov 1, 1999 | — | — |
| 00 | Aug 24, 1998 | Jul 17, 1998 | — |
| 00 | Dec 6, 1985 | Oct 30, 1985 | Yes |
| 00 | Nov 13, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-013-33384 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-013-33384 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01333384, documented in the API reference.