TEXAS · WELLS · ATASCOSA COUNTY · KELLNER-MCMAHON UNIT LEASE · API 42-013-34360 · DISTRICT 01

Kellner-McMahon Unit #1H

Y

Atascosa County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Kellner-Mcmahon Unit #1H (API 42-013-34360) is a horizontal well in Atascosa County operated by Marathon Oil EF LLC, completed August 21, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued April 28, 2011, permitted to 11,168 ft.

It was permitted by Hilcorp Energy Company and has since transferred to Marathon Oil EF LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 153K barrels of oil and 227K mcf of gas since August 2011, last reporting in July 2026.

Operator of record

Marathon Oil EF LLC

Permitted by Hilcorp Energy Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Sep 26, 2025
Permits on file
3,191
Phone
(832) 486-2737

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil EF LLC
Production reportsMarathon Oil EF LLCthrough Feb 2026
Latest permitHilcorp Energy CompanyApr 28, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,168
total depth, ft
2
permits on file
Apr 28, 2011
last permit issued
Aug 21, 2011
completed
153K
cumulative oil, bbl
227K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 21, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kellner-McMahon Unit O-1-15562Eagleville (Eagle Ford-1)Marathon Oil EF LLC1153K227KAug 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 608(-100%)

05001K202420252026

Gas, mcf lease total

Last 12 months 14 · prior 12 1,027(-99%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hilcorp Energy CompanyAug 2011 → Oct 2011
  2. 2Marathon Oil EF LLCNov 2011 → Nov 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
714856-98DrillHilcorp Energy CompanyJun 8, 2011Apr 28, 2011Jul 19, 201113,500
714856-99DrillHilcorp Energy CompanyApr 25, 2011Apr 28, 2011Jul 19, 201113,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 21, 2011Kellner-McMahon Unit O-1-15562Eagleville (Eagle Ford-1)Marathon Oil EF LLCProducing11,168

Formation tops

As filed on W-2/G-1. Subsea from 397 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho10,600-10,203
Austin Chalk10,775-10,378
Eagle Ford10,990-10,593

Perforations

Perforated and open-hole intervals.

FromToType
11,00415,842Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.755,50013.52,320 S
8.515,9598.52,150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 15, 2012Oct 25, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01334360, documented in the API reference.