TEXAS · WELLS · ATASCOSA COUNTY · DEATLEY-GRIFFIN UNIT LEASE · API 42-013-34418 · DISTRICT 01

Deatley-Griffin Unit #1H

Shut in

Atascosa County · Eagleville (Eagle Ford-1) field · Shut In  · Horizontal

Deatley-Griffin Unit #1H (API 42-013-34418) is a horizontal well in Atascosa County operated by Marathon Oil EF LLC, completed October 30, 2011 and listed as shut in on the RRC schedule, shut in April 1, 2024.

The RRC has issued one drilling permit, issued August 29, 2011, permitted to 10,789 ft.

It was permitted by Hilcorp Energy Company and has since transferred to Marathon Oil EF LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 172K barrels of oil and 240K mcf of gas since October 2011, last reporting in July 2026.

Operator of record

Marathon Oil EF LLC

Permitted by Hilcorp Energy Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Sep 26, 2025
Permits on file
3,191
Phone
(832) 486-2737

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil EF LLC
Production reportsMarathon Oil EF LLCthrough Feb 2024
Latest permitHilcorp Energy CompanyAug 29, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,789
total depth, ft
1
permits on file
Aug 29, 2011
last permit issued
Oct 30, 2011
completed
172K
cumulative oil, bbl
240K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 30, 2011
Shut in
Apr 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Deatley-Griffin Unit O-1-15660Eagleville (Eagle Ford-1)Marathon Oil EF LLC1172K240KOct 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil EF LLCNov 2011 → Feb 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
722891-99DrillHilcorp Energy CompanyAug 23, 2011Aug 29, 2011Sep 25, 201113,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 30, 2011Deatley-Griffin Unit O-1-15660Eagleville (Eagle Ford-1)Marathon Oil EF LLCShut In · shut in Apr 1, 202410,789

Formation tops

As filed on W-2/G-1. Subsea from 417 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho10,540-10,123
Austin ChalkAUSTIN10,680-10,263
Austin Chalk10,680-10,263
Eagle Ford10,810-10,393
Eagle FordEAGLEFORD10,810-10,393

Perforations

Perforated and open-hole intervals.

FromToType
11,29714,857Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.755,33013.52,230 S
5.515,0008.52,140 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 21, 2024Mar 7, 2024—
00Mar 28, 2012Nov 8, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01334418, documented in the API reference.