TEXAS · WELLS · ATASCOSA COUNTY · SIMMONS SUBDIVISION UNIT LEASE · API 42-013-34656 · DISTRICT 01
Simmons Subdivision Unit #1H
Atascosa County · Eagleville (Eagle Ford-1) field · Producing · Horizontal
Simmons Subdivision Unit #1H (API 42-013-34656) is a horizontal well in Atascosa County operated by Javelin Energy Partners Mgmt LLC, completed March 5, 2013 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued January 18, 2013, permitted to 7,741 ft.
It was permitted by EP Energy E&P Company, L.P. and has since transferred to Javelin Energy Partners Mgmt LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Ancc, Astn, Egfd.
Its lease has reported 139K barrels of oil and 81.3K mcf of gas since February 2013, last reporting volume in June 2025.
Operator of record
Javelin Energy Partners Mgmt LLC
Permitted by EP Energy E&P Company, L.P.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 24, 2026
- Permits on file
- 234
- Phone
- (469) 575-3800
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Javelin Energy Partners Mgmt LLC |
| Production reports | Javelin Energy Partners Mgmt LLCthrough Jun 2025 |
| Latest permit | EP Energy E&P Company, L.P.Jan 18, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,741
- total depth, ft
- 1
- permits on file
- Jan 18, 2013
- last permit issued
- Mar 5, 2013
- completed
- 139K
- cumulative oil, bbl
- 81.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2013 THROUGH Jun 2025
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 5, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Simmons Subdivision Unit O-1-16637 | Eagleville (Eagle Ford-1) | Javelin Energy Partners Mgmt LLC | 1 | 139K | 81.3K | Feb 2013 – Jun 2025 |
Oil, barrels lease total
Last 12 months 62 · prior 12 74(-16%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EP Energy E&P Company, L.P.Mar 2013 → Dec 2014
- 2Cabot Oil & Gas CorporationJan 2015 → Jan 2018
- 3Venado Operating Company LLCFeb 2018 → Mar 2022
- 4Javelin Energy Partners Mgmt LLCApr 2022 → Jun 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 754773-99 | Drill | EP Energy E&P Company, L.P. | Jan 15, 2013 | Jan 18, 2013 | Feb 27, 2013 | 9,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 5, 2013 | Simmons Subdivision Unit O-1-16637 | Eagleville (Eagle Ford-1) | Javelin Energy Partners Mgmt LLC | Producing | 7,741 |
Formation tops
As filed on W-2/G-1. Subsea from 395 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Ancc | 7,004 | -6,609 |
| Astn | 7,240 | -6,845 |
| Egfd | 7,638 | -7,243 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,079 | 12,326 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 4,550 | 12.25 | 1,360 S |
| 5.5 | 6,465 | 8.75 | 1,515 S |
| 5 | 12,470 | 8.75 | 1,515 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 16, 2020 | Sep 8, 2020 | — |
| 00 | Jul 11, 2013 | May 9, 2013 | Yes |
| 00 | May 13, 2013 | Mar 15, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-013-34656 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-013-34656 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01334656, documented in the API reference.