TEXAS · WELLS · ATASCOSA COUNTY · PEELER NE UNIT B LEASE · API 42-013-35194 · DISTRICT 01
Peeler NE Unit B #1H
Atascosa County · Eagleville (Eagle Ford-1) field · Producing · Horizontal
Peeler NE Unit B #1H (API 42-013-35194) is a horizontal well in Atascosa County operated by Trailblazer Energy Resources LLC, completed March 3, 2015 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued October 6, 2014, permitted to 8,427 ft.
It was permitted by Murphy Expl. & Prod. CO. - USA and has since transferred to Trailblazer Energy Resources LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Queen City, Reklaw, Escondido, Carrizo.
Its lease has reported 163K barrels of oil and 154K mcf of gas since December 2014, last reporting volume in April 2026.
Operator of record
Trailblazer Energy Resources LLC
Permitted by Murphy Expl. & Prod. Co. - USA; the EWA schedule now lists a different operator.
- Based in
- Tulsa, OK
- P-5 status
- Active (A)
- P-5 last filed
- Oct 16, 2025
- Permits on file
- 30
- Phone
- (918) 728-3020
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trailblazer Energy Resources LLC |
| Production reports | Trailblazer Energy Resources,llcthrough Apr 2026 |
| Latest permit | Murphy Expl. & Prod. Co. - USAOct 6, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,427
- total depth, ft
- 1
- permits on file
- Oct 6, 2014
- last permit issued
- Mar 3, 2015
- completed
- 163K
- cumulative oil, bbl
- 154K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2015 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 3, 2015
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Peeler NE Unit B O-1-18332 | Eagleville (Eagle Ford-1) | Trailblazer Energy Resources,llc | 1 | 163K | 154K | Dec 2014 – Apr 2026 |
Oil, barrels lease total
Last 12 months 4,392 · prior 12 4,638(-5%)
Gas, mcf lease total
Last 12 months 5,990 · prior 12 6,975(-14%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Murphy Expl. & Prod. Co. - USAFeb 2015 → Dec 2016
- 2Cinco Oil & Gas, LLCJan 2017 → Jan 2026
- 3Trailblazer Energy Resources,llcFeb 2026 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 796499-99 | Drill | Murphy Expl. & Prod. Co. - USA | Sep 17, 2014 | Oct 6, 2014 | Dec 17, 2014 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 3, 2015 | Peeler NE Unit B O-1-18332 | Eagleville (Eagle Ford-1) | Trailblazer Energy Resources LLC | Producing | 8,427 |
Formation tops
As filed on W-2/G-1. Subsea from 436 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 1,660 | -1,224 |
| Reklaw | 2,000 | -1,564 |
| EscondidoESCONDIDO - H2S, DISPOSAL | 2,600 | -2,164 |
| Carrizo | 2,700 | -2,264 |
| WilcoxWILCOX - DISPOSAL | 2,800 | -2,364 |
| Bartosh | 3,150 | -2,714 |
| Bartosh | 3,520 | -3,084 |
| NavarroNAVARRO - H2S | 5,938 | -5,502 |
| OlmosOLMOS - DISPOSAL | 6,747 | -6,311 |
| EscondidoESCONDIDO - H2S, DISPOSAL | 7,620 | -7,184 |
| AnacachoANACACHO - H2S | 8,081 | -7,645 |
| Austin ChalkAUSTIN CHALK - H2S, DISPOSAL | 8,164 | -7,728 |
| Queen City | 8,300 | -7,864 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,953 | 15,039 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,828 | 12.25 | 975 S |
| 5.5 | 15,183 | 7.875 | 1,535 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 24, 2015 | Aug 17, 2015 | Yes |
| 00 | Jul 27, 2015 | Mar 9, 2015 | Yes |
Well logs
1 log loaded from the RRC's log index, 1 of it with a digital LAS file, the latest received Dec 20, 2017. While drilling (MWD). These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| Measure While Drilling (MWD)Spans Bartosh, Navarro, Olmos, Anacacho, Austin Chalk | LAS + TIFF | 3,828 to 15,183 | Dec 20, 2017 | 0.50 + 10.3 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-013-35194 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-013-35194 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01335194, documented in the API reference.