WELL · 42-015-30129 · DISTRICT 3
Schumann Fritz et AL #1
Austin County · Nelsonville ( 8 450) field · Vertical
Schumann Fritz ET AL #1 (API 42-015-30129) is a plugged well in Austin County, plugged August 11, 1995, last operated by Magnum Producing & Operating CO..
The RRC has issued 2 drilling permits between 1991 and 1995, permitted to 10,816 ft.
Completion filings report 3 formation tops, including Yegua, Claiborne, Wilcox.
Operator of record
Magnum Producing & Operating Co.
- Based in
- Corpus Chrsti, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 29, 2003
- Permits on file
- 173
- Phone
- (361) 882-3858
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Magnum Producing & Operating Co. |
| Production reports | Magnum Producing & Operating Co.through Apr 1995 |
| Latest permit | Magnum Producing & Operating Co.Apr 3, 1995 |
- 10,816
- total depth, ft
- 2
- permits on file
- Apr 3, 1995
- last permit issued
- Aug 18, 1973
- completed
- 0
- cumulative oil, bbl
- 22.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 18, 1973
- Shut in
- —
- Plugged
- Aug 11, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Schumann, Fritz et AL G-3-138061 | Nelsonville (Wilcox 9,000) | Magnum Producing & Operating Co. | 1 | 0 | 21.7K | Jan 1993 – Aug 1995 |
| Schumann, Fritz et AL G-3-153874 | Nelsonville (Wilcox 7,500) | Magnum Producing & Operating Co. | 1 | 0 | 1.12K | Mar 1995 – Aug 1995 |
| — G-3-57435 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Magnum Producing & Operating Co.Jan 1993 → Apr 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 434376-99 | Recompletion | Magnum Producing & Operating Co. | Mar 31, 1995 | Apr 3, 1995 | Mar 6, 1995 | 10,816 |
| 387311-99 | Recompletion | Magnum Producing & Operating Co. | Apr 30, 1991 | May 2, 1991 | Apr 19, 1991 | 10,816 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-57435 | — | — | — | — |
| — | — G-3-138061 | — | — | — | — |
| — | — G-3-153874 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 212 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,511 | 7,515 | Perforated |
| 8,418 | 8,424 | Perforated |
| 8,979 | 8,988 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,244 | 95 | 730 S |
| 10.75 | 2,244 | 15 | 930 S |
| 5.5 | 9,211 | 7.875 | 1,021 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 19, 1995 | Mar 31, 1995 | Yes |
| 00 | May 9, 1995 | — | — |
| 00 | May 28, 1991 | May 8, 1991 | Yes |
| 00 | May 10, 1991 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-015-30129 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-015-30129 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01530129, documented in the API reference.