WELL · 42-015-30877 · DISTRICT 3

Blezinger #4

N

Austin County · New Ulm (LWR Wilcox Cons.) field  · Vertical

Blezinger #4 (API 42-015-30877) is a well in Austin County operated by Strand Energy L.C., completed August 21, 2018.

The RRC has issued one drilling permit, issued October 22, 2004, permitted to 11,000 ft.

Completion filings report 9 formation tops, including T/ Yegua, T/Yegua, T/ U. Wilcox, T/U. Wilcox.

Its 2 leases have reported 28.8K barrels of oil and 1.33M mcf of gas since April 2005, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Strand Energy L.C.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 30, 2026
Permits on file
321
Phone
(713) 658-8096

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStrand Energy L.C.
Production reportsStrand Energy, L.C.through Apr 2026
Latest permitStrand Energy, L.C.Oct 22, 2004
11,000
total depth, ft
1
permits on file
Oct 22, 2004
last permit issued
Aug 21, 2018
completed
28.8K
cumulative oil, bbl
1.33M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 21, 2018
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blezinger O-3-27934New Ulm (LWR Wilcox Cons.)Strand Energy, L.C.228.8K128KNov 2021 – Jul 2026
Blezinger G-3-208438New Ulm (Wilcox 10500)Strand Energy, L.C.101.2MApr 2005 – Dec 2023

Oil, barrels lease total

Last 12 months 5,156 · prior 12 6,487(-21%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 28,696 · prior 12 36,891(-22%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Strand Energy, L.C.Apr 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
552719-99DrillStrand Energy, L.C.Oct 22, 2004Oct 22, 2004Nov 1, 200411,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-208438————
—— O-3-27934————

Formation tops

As filed on W-2/G-1. Subsea from 270 ft elevation.Download CSV →

FormationMD ftSubsea
T/ Yegua3,755-3,485
T/Yegua3,755-3,485
T/ U. Wilcox6,880-6,610
T/U. Wilcox6,880-6,610
T/U.wilcox6,880-6,610
T/ U. Wilox6,880-6,610
T/ L. Wilcox8,400-8,130
T/L. Wilcox8,400-8,130
T/L.wilcox8,400-8,130

Perforations

Perforated and open-hole intervals.

FromToType
9,5219,527Perforated
9,5539,559Perforated
9,6519,654Perforated
9,6879,690Perforated
9,7179,721Perforated
9,8689,872Perforated
10,01410,018Perforated
10,10610,110Perforated
10,12810,138Perforated
10,24010,244Perforated
10,46410,478Perforated
10,48110,485Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,34512.251,040 S
4.510,7788.75500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 16, 2024Jan 4, 2024—
00Sep 27, 2018Sep 18, 2018—
00Apr 21, 2015Mar 18, 2014—
00Jan 28, 2013Aug 9, 2012—
00May 7, 2007Jan 19, 2007—
00Jul 27, 2005May 6, 2005Yes
00Jun 1, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01530877, documented in the API reference.