WELL · 42-015-30894 · DISTRICT 3

Waterflood Unit #1 #86

Y

Austin County · Raccoon Bend (Jackson) field · Producing  · Vertical

Waterflood Unit #1 #86 (API 42-015-30894) is a well in Austin County operated by Enhanced Energy Partners Corp, completed May 24, 2005 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued April 26, 2005, permitted to 4,000 ft.

It was permitted by T-N-T Engineering, Inc. and has since transferred to Enhanced Energy Partners Corp on the wellbore schedule.

Its lease has reported 1.6M barrels of oil and 242K mcf of gas since January 1993, last reporting in July 2026. The lease carries 77 wells, so these are lease totals, not this well alone.

Operator of record

Enhanced Energy Partners Corp

Permitted by T-N-T Engineering, Inc.; the EWA schedule now lists a different operator.

Based in
Tomball, TX
P-5 status
Active (A)
P-5 last filed
Jan 16, 2026
Permits on file
172
Phone
(713) 705-4312

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnhanced Energy Partners Corp
Production reportsEnhanced Energy Partners Corpthrough Apr 2026
Latest permitT-N-T Engineering, Inc.Apr 26, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
2
permits on file
Apr 26, 2005
last permit issued
May 24, 2005
completed
1.6M
cumulative oil, bbl
242K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 24, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 77 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Waterflood Unit #1 O-3-8909Raccoon Bend (Jackson)Enhanced Energy Partners Corp771.6M242KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 35,536 · prior 12 25,090(+42%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 5,413 · prior 12 0

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Apr 1999
  2. 2Future Petroleum CorporationMay 1999 → Jul 1999
  3. 3Bargo Energy CompanyAug 1999 → May 2001
  4. 4Mission Resources CorporationJun 2001 → Nov 2003
  5. 5T-N-T Engineering, Inc.Dec 2003 → Sep 2007
  6. 6Enhanced Energy Partners CorpOct 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
560951-98DrillT-N-T Engineering, Inc.May 25, 2006Apr 26, 2005Apr 30, 20054,000
560951-99DrillT-N-T Engineering, Inc.Apr 22, 2005Apr 26, 2005Apr 30, 20054,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-8909————

Perforations

Perforated and open-hole intervals.

FromToType
3,4853,489Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62586112.25305 S
5.53,5457.875466 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 27, 2006Jan 23, 2006Yes
00Jun 9, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01530894, documented in the API reference.