TEXAS · WELLS · AUSTIN COUNTY · API 42-015-80198 · DISTRICT 03

Waterflood Unit #1 #12

Plugged

Austin County · Raccoon Bend (Jackson) field  · Vertical

Waterflood Unit #1 #12 (API 42-015-80198) is a plugged well in Austin County, plugged April 25, 1989, last operated by Enhanced Energy Partners Corp.

The RRC has issued one drilling permit, issued May 27, 1988, permitted to 3,553 ft.

It was permitted by Exxon Corp. and has since transferred to Enhanced Energy Partners Corp on the wellbore schedule.

Operator of record

Enhanced Energy Partners Corp

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Tomball, TX
P-5 status
Active (A)
P-5 last filed
Jan 16, 2026
Permits on file
172
Phone
(713) 705-4312

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnhanced Energy Partners Corp
Production reportsnone
Latest permitExxon Corp.May 27, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,553
total depth, ft
1
permits on file
May 27, 1988
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 25, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
346940-99OtherExxon Corp.May 25, 1988May 27, 1988—3,553

Completions

CompletedLeaseFieldOperatorStatusDepth
—Waterflood Unit #1 O-3-8909Raccoon Bend (Jackson)Enhanced Energy Partners CorpPlugged—
—Waterflood Unit #1 O-3-8909Raccoon Bend (Jackson)Enhanced Energy Partners CorpPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
3,1133,444Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Aug 31, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.