TEXAS · WELLS · BASTROP COUNTY · MONROE STEGLICH UNIT LEASE · API 42-021-30926 · DISTRICT 03

Monroe Steglich Unit #1

Shut in

Bastrop County · Serbin (Taylor Sand) field · NO Production  · Vertical

Monroe Steglich Unit #1 (API 42-021-30926) is a well in Bastrop County operated by Trivista Operating LLC, completed March 14, 1986 and listed as no production on the RRC schedule, shut in June 1, 2025.

The RRC has issued 2 drilling permits between 1985 and 1986, permitted to 7,140 ft.

It was permitted by Kelpetro, Inc. and has since transferred to Trivista Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Navarro, Taylor, Austin Chalk.

Its lease has reported 18.7K barrels of oil and 109K mcf of gas since January 1993, last reporting volume in February 2026.

Operator of record

Trivista Operating LLC

Permitted by Kelpetro, Inc.; the EWA schedule now lists a different operator.

Based in
Giddings, TX
P-5 status
Delinquent (D)
P-5 last filed
Sep 30, 2025
Permits on file
3
Phone
(979) 366-2700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrivista Operating LLC
Production reportsTrivista Operating LLCthrough Feb 2026
Latest permitKelpetro, Inc.Jul 21, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,140
total depth, ft
2
permits on file
Jul 21, 1986
last permit issued
Mar 14, 1986
completed
18.7K
cumulative oil, bbl
109K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 14, 1986
Shut in
Jun 1, 2025
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Monroe Steglich Unit O-3-19379Serbin (Taylor Sand)Trivista Operating LLC118.7K109KJan 1993 – Feb 2026

Gas, mcf lease total

Last 12 months 144 · prior 12 47(+206%)

0204060202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 4(-100%)

01020202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1South Texas Drilling & Expl, IncJan 1993 → Jan 1999
  2. 2Texas Vanguard Oil CompanyFeb 1999 → Sep 2013
  3. 3Trivista Operating LLCOct 2013 → Jun 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
304577-99DrillKelpetro, Inc.Jul 8, 1986Jul 21, 1986—7,150
290134-99DrillKelpetro, Inc.Jul 8, 1986Nov 15, 1985—7,150

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 14, 1986Monroe Steglich Unit O-3-19379Serbin (Taylor Sand)Trivista Operating LLCNO Production · shut in Jun 1, 20257,140

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Navarro4,630
Taylor5,200
Austin Chalk6,350

Perforations

Perforated and open-hole intervals.

FromToType
5,2045,208Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62578012.25350 S
4.55,3607.875925 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 20, 1986Jun 20, 1986Yes
00Oct 11, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02130926, documented in the API reference.