WELL · 42-021-31556 · DISTRICT 1

Camp Swift #5

Plugged

Bastrop County · Wildcat field  · Vertical

Camp Swift #5 (API 42-021-31556) is a plugged well in Bastrop County, plugged September 1, 2006, last operated by Tanglewood Oil & Gas CO..

The RRC has issued one drilling permit, issued January 9, 2003, permitted to 3,900 ft.

Completion filings report 3 formation tops, including Pecan Gap, Dale Lime, Serpentine.

Operator of record

Tanglewood Oil & Gas Co.

Based in
Gouldbusk, TX
P-5 status
Active (A)
P-5 last filed
Sep 11, 2025
Permits on file
26
Phone
(830) 534-5166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTanglewood Oil & Gas Co.
Production reportsnone
Latest permitTanglewood Oil & Gas Co.Jan 9, 2003
3,900
total depth, ft
1
permits on file
Jan 9, 2003
last permit issued
Aug 21, 2003
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH Oct 2006

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 21, 2003
Shut in
—
Plugged
Sep 1, 2006

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Camp Swift O-1-14456WildcatTanglewood Oil & Gas Co.100Aug 2003 – Oct 2006

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
527098-99DrillTanglewood Oil & Gas Co.Jan 9, 2003Jan 9, 2003May 21, 20033,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-14456————

Formation tops

As filed on W-2/G-1. Subsea from 469 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap2,950-2,481
Dale Lime3,220-2,751
Serpentine3,340-2,871

Perforations

Perforated and open-hole intervals.

FromToType
3,2823,322Perforated
3,2903,310Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,42912.25214 S
5.53,4287.875180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 17, 2003Aug 28, 2003Yes
00Sep 10, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02131556, documented in the API reference.