WELL · 42-023-31703 · DISTRICT 9
Quisenberry #2
Baylor County · Baylor County Regular field · Vertical
Quisenberry #2 (API 42-023-31703) is a plugged well in Baylor County, plugged April 5, 2024, last operated by Dry Fork Production CO. LLC.
The RRC has issued one drilling permit, issued April 30, 2015, permitted to 3,999 ft.
Completion filings report 10 formation tops, including Palo Pinto, Canyon, Cisco, Coleman Junction.
Its lease has reported 20.2K barrels of oil since November 2012, last reporting in May 2025. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed Feb 4, 2026 · 207 permits on file · (940) 704-7200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dry Fork Production Co. LLC |
| Production reports | Dry Fork Production Co., LLCthrough Dec 2024 |
| Latest permit | Dry Fork Production Co., LLCApr 30, 2015 |
- 3,999
- total depth, ft
- 1
- permits on file
- Apr 30, 2015
- last permit issued
- Oct 21, 2015
- completed
- 20.2K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2012 THROUGH May 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 21, 2015
- Shut in
- —
- Plugged
- Apr 5, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Quisenberry O-13-32614 | Baylor County Regular | Dry Fork Production Co., LLC | 3 | 20.2K | 0 | Nov 2012 – May 2025 |
Oil, barrels lease total
Last 12 months 0 · prior 12 283(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dry Fork Production Co., LLCJan 2013 → Dec 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 805480-99 | Drill | Dry Fork Production Co., LLC | Apr 10, 2015 | Apr 30, 2015 | Sep 17, 2015 | 3,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-32614 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,285 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 3,109 | -1,824 |
| CanyonCANYON REEF | — | — |
| Cisco | — | — |
| Coleman JunctionCOLEMAN JUNCTION - CORROSIVE ZON | — | — |
| GunsightGUNSIGHT SAND | — | — |
| Home Creek | — | — |
| Saddle Creek | — | — |
| Strawn | — | — |
| TannehillTANNEHILL SAND | — | — |
| Thomas Sand | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,109 | 3,114 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 126 | 12.25 | 100 S |
| 5.5 | 3,610 | 7.875 | 50 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 17, 2015 | Dec 2, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-023-31703 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-023-31703 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02331703, documented in the API reference.