WELL · 42-023-31831 · DISTRICT 9
Waggoner Dnta #2581DN
Baylor County · Baylor County Regular field · Producing · Vertical
Waggoner Dnta #2581DN (API 42-023-31831) is a well in Baylor County operated by Waggoner Operating L.L.C., completed July 18, 2025 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued May 27, 2025, permitted to 6,000 ft.
Completion filings report 10 formation tops, including Tannehill, Saddle Creek, Gunsight, Canyon.
Its lease has reported 34.7K barrels of oil since May 2024, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Vernon, TX · P-5 Y, filed Feb 4, 2026 · 80 permits on file · (940) 552-2521
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Waggoner Operating L.L.C. |
| Production reports | Waggoner Operating, L.L.C.through Mar 2026 |
| Latest permit | Waggoner Operating, L.L.C.May 27, 2025 |
- 6,000
- total depth, ft
- 1
- permits on file
- May 27, 2025
- last permit issued
- Jul 18, 2025
- completed
- 34.7K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2024 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 18, 2025
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Waggoner Dnta O-13-34297 | Baylor County Regular | Waggoner Operating, L.L.C. | 2 | 34.7K | 0 | May 2024 – Jul 2026 |
Oil, barrels lease total
Last 12 months 17,393 · prior 12 17,301(+1%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1W.T. Waggoner Estate, Inc.Jun 2024 → Feb 2025
- 2Waggoner Operating, L.L.C.Mar 2025 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 908175-99 | Drill | Waggoner Operating, L.L.C. | May 22, 2025 | May 27, 2025 | Jun 10, 2025 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-34297 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,175 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| TannehillTANNEHILL SAND | 1,199 | -24 |
| Saddle Creek | 1,541 | -366 |
| GunsightGUNSIGHT SAND | 2,322 | -1,147 |
| CanyonCANYON REEF | 2,945 | -1,770 |
| Cisco | — | — |
| Coleman JunctionCOLEMAN JUNCTION - CORROSIVE ZON | — | — |
| Home Creek | — | — |
| Palo Pinto | — | — |
| Strawn | — | — |
| Thomas Sand | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,928 | 4,948 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 252 | 12.25 | 200 S |
| 5.5 | 5,515 | 7.875 | 365 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 19, 2026 | Jan 30, 2026 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-023-31831 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-023-31831 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.