TEXAS · WELLS · BEE COUNTY · API 42-025-01876 · DISTRICT 02
Davis Nona Berry #28
Bee County · Yougeen (Frio 3610) field · Producing · Vertical
Davis Nona Berry #28 (API 42-025-01876) is a well in Bee County operated by Welderxp Ltd., completed December 5, 2006 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued March 2, 2007, permitted to 3,828 ft.
It was permitted by Welder Exploration & Prod., Inc. and has since transferred to Welderxp Ltd. on the wellbore schedule.
Completion filings report one formation top, including Frio.
Its 2 leases have reported 889K barrels of oil and 3.25M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 44 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Welder Exploration & Prod., Inc.; the EWA schedule now lists a different operator.
- Based in
- San Antonio, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 29, 2026
- Permits on file
- 14
- Phone
- (210) 354-1515
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Welderxp Ltd. |
| Production reports | Welderxp Ltd.through Apr 2026 |
| Latest permit | Welder Exploration & Prod., Inc.Mar 2, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,828
- total depth, ft
- 1
- permits on file
- Mar 2, 2007
- last permit issued
- Dec 5, 2006
- completed
- 889K
- cumulative oil, bbl
- 3.25M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 5, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 44 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davis, Nona Berry G-2-225640 | Yougeen (Frio 3610) | Welderxp Ltd. | 1 | 0 | 281K | Dec 2006 – Apr 2026 |
| Davis, Nona Berry O-2-1738 | Yougeen | Welderxp Ltd. | 43 | 889K | 2.97M | Jan 1993 – Apr 2026 |
Oil, barrels lease total
Last 12 months 9,559 · prior 12 23,093(-59%)
Gas, mcf lease total
Last 12 months 8,359 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hollimon Oil CorporationJan 1993 → Oct 2006
- 2Welder Exploration & Prod., Inc.Nov 2006 → Dec 2022
- 3Welderxp Ltd.Jan 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 632659-99 | Recompletion | Welder Exploration & Prod., Inc. | Jan 29, 2007 | Mar 2, 2007 | Dec 5, 2006 | 3,828 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 5, 2006 | Davis Nona Berry G-2-225640 | Yougeen (Frio 3610) | Welderxp Ltd. | Producing | 3,828 |
| Feb 28, 1986 | Davis N.B. G-2-120715 | Yougeen | Texaco Producing Inc. | Not on Schedule | — |
| — | Davis Nona Berry O-2-1738 | Yougeen | Welderxp Ltd. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 242 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| FrioFRIO 3610 | 3,570 | -3,328 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,570 | 3,590 | Perforated |
| 3,772 | 3,777 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 515 | — | — |
| 9.625 | 515 | 12.25 | 350 S |
| 9.625 | 515 | — | 350 S |
| 5.5 | 3,828 | 7.875 | 200 S |
| 5.5 | 3,828 | — | 575 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 16, 2007 | Mar 8, 2007 | — |
| 00 | Mar 29, 2007 | — | — |
| 00 | Dec 1, 1986 | Nov 5, 1986 | — |
| 00 | May 1, 1986 | Apr 7, 1986 | Yes |
| 00 | Apr 16, 1986 | — | — |
| 00 | Jan 12, 1984 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-01876 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-01876 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02501876, documented in the API reference.