WELL · 42-025-02526 · DISTRICT 2
Collier G. U. #10
Bee County · Theis South (Wilcox 9925) field · Vertical
Collier G. U. #10 (API 42-025-02526) is a plugged well in Bee County, plugged May 18, 2017, last operated by Enco Exploration Company.
The RRC has issued one drilling permit, issued July 28, 2006, permitted to 11,000 ft.
Operator of record
- Based in
- Corpus Christ, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 19, 2020
- Permits on file
- 204
- Phone
- (361) 882-6100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enco Exploration Company |
| Production reports | Enco Exploration Companythrough Feb 2017 |
| Latest permit | Enco Exploration CompanyJul 28, 2006 |
- 11,000
- total depth, ft
- 1
- permits on file
- Jul 28, 2006
- last permit issued
- Mar 26, 2009
- completed
- 0
- cumulative oil, bbl
- 359K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 26, 2009
- Shut in
- —
- Plugged
- May 18, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Collier G. U. G-2-249540 | Theis, South (Wilcox 9925) | Enco Exploration Company | 1 | 0 | 25.6K | Mar 2009 – May 2017 |
| Collier Gas Unit #1 O/A G-2-68224 | Norbee (Slick) | Enco Exploration Company | 1 | 0 | 334K | Jan 1993 – Mar 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hydrocarbon Horizons, Inc.Jan 1993 → Dec 1993
- 2Hydrocarbon Operating, Inc.Jan 1994 → Nov 1997
- 3Wagner, Duer & Co.Dec 1997 → Dec 1998
- 4Wagner Oil CompanyJan 1999 → Jan 2004
- 5Enco Exploration CompanyMar 2009 → Feb 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 622965-99 | Recompletion | Enco Exploration Company | Jul 20, 2006 | Jul 28, 2006 | Oct 17, 2006 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-68224 | — | — | — | — |
| — | — G-2-249540 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,184 | 9,193 | Perforated |
| 9,199 | 9,205 | Perforated |
| 9,475 | 9,524 | Perforated |
| 9,816 | 9,828 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 5,385 | — | — |
| 9.625 | 5,386 | 13.75 | 1,560 S |
| 9.625 | 5,386 | — | — |
| 5.5 | 9,850 | 8.75 | 315 S |
| 5.5 | 9,850 | — | 564 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 24, 2009 | Apr 30, 2009 | Yes |
| 00 | Jul 27, 2009 | — | — |
| 00 | Mar 10, 1987 | Feb 17, 1987 | — |
| 00 | Jan 12, 1984 | Sep 20, 1976 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-02526 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-02526 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02502526, documented in the API reference.