TEXAS · WELLS · BEE COUNTY · API 42-025-31137 · DISTRICT 02

Pogue #1

Plugged

Bee County · Pawnee S. (Wilcox) field  · Vertical

Pogue #1 (API 42-025-31137) is a plugged well in Bee County, plugged March 16, 1982, last operated by Txo Production Corp..

The RRC has issued one drilling permit, issued June 20, 1979, permitted to 9,200 ft.

It was permitted by Texas Oil & Gas Corp. and has since transferred to Txo Production Corp. on the wellbore schedule.

Operator of record

TXO Production Corp.

Permitted by Texas Oil & Gas Corp.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 2, 1990
Permits on file
3,227
Phone
(214) 954-2086

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsnone
Latest permitTexas Oil & Gas Corp.Jun 20, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,200
total depth, ft
1
permits on file
Jun 20, 1979
last permit issued
Sep 21, 1979
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 21, 1979
Shut in
—
Plugged
Mar 16, 1982

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
51260-99DrillTexas Oil & Gas Corp.Jun 20, 1979Jun 20, 1979Jul 29, 19799,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 21, 1979Pogue G-2-85763Pawnee S. (Wilcox)TXO Production Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
8,6278,639Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,20613.51,190 S
2.8758,8127.8751,090 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Dec 11, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02531137, documented in the API reference.