WELL · 42-025-31513 · DISTRICT 2
Nolen Joyce #2
Bee County · Blanconia (5000) field · Vertical
Nolen Joyce #2 (API 42-025-31513) is a plugged well in Bee County, plugged May 21, 1990, last operated by Esenjay Petroleum Corp..
The RRC has issued 5 drilling permits between 1981 and 1987, permitted to 5,500 ft.
Completion filings report 4 formation tops, including Frio, Catahoula, Sinton, Vicksburg.
Operator of record
- Based in
- Corpus Chrsti, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 31, 1998
- Permits on file
- 381
- Phone
- (512) 883-7464
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Esenjay Petroleum Corp. |
| Production reports | none |
| Latest permit | Esenjay Petroleum Corp.Jul 14, 1987 |
- 5,500
- total depth, ft
- 5
- permits on file
- Jul 14, 1987
- last permit issued
- Jul 11, 1981
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 11, 1981
- Shut in
- —
- Plugged
- May 21, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-2-124767 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 332763-99 | Recompletion | Esenjay Petroleum Corp. | Jul 13, 1987 | Jul 14, 1987 | — | 5,308 |
| 320487-99 | Recompletion | Esenjay Petroleum Corp. | Sep 12, 1986 | Sep 23, 1986 | — | 5,308 |
| 287345-99 | Recompletion | Esenjay Petroleum Corp. | Oct 14, 1985 | Oct 14, 1985 | — | 5,308 |
| 231978-99 | Recompletion | Esenjay Petroleum Corp. | Mar 7, 1984 | Mar 12, 1984 | — | 5,308 |
| 109896-99 | Drill | Esenjay Petroleum Corp. | Mar 2, 1981 | Mar 2, 1981 | — | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-124767 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 86 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,008 | 4,016 | Perforated |
| 4,051 | 4,055 | Perforated |
| 4,188 | 4,194 | Perforated |
| 4,500 | 4,510 | Perforated |
| 4,971 | 4,975 | Perforated |
| — | 4,975 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 305 | 12.25 | 120 S |
| 2.375 | 4,901 | — | — |
| 4.5 | 5,263 | 7.625 | 915 S |
| 4.5 | 5,263 | 7.875 | 915 S |
| 4.5 | 5,263 | 7.889 | 915 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 17, 1987 | Aug 3, 1987 | Yes |
| 00 | Aug 11, 1987 | — | — |
| 00 | Oct 21, 1986 | Sep 25, 1986 | Yes |
| 00 | Oct 13, 1986 | — | — |
| 00 | Feb 3, 1986 | Jan 9, 1986 | Yes |
| 00 | Jan 23, 1986 | — | — |
| 00 | Jun 14, 1984 | Apr 30, 1984 | — |
| 00 | Jun 2, 1984 | Apr 30, 1984 | — |
| 00 | Jan 12, 1984 | Jul 21, 1981 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-31513 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-31513 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02531513, documented in the API reference.