TEXAS · WELLS · BEE COUNTY · HANUS, LOUISE LEASE · API 42-025-32090 · DISTRICT 02

Hanus Louise #1

Plugged

Bee County · Tynan (1700) field  · Vertical

Hanus Louise #1 (API 42-025-32090) is a plugged well in Bee County, plugged August 20, 2009, last operated by Gulf Sands Oil CO..

The RRC has issued 3 drilling permits between 1983 and 1988, permitted to 5,000 ft.

It was permitted by Rincon Petroleum Corporation and has since transferred to Gulf Sands Oil CO. on the wellbore schedule.

Completion filings report 3 formation tops, including Het, Frio, Vicksburg.

Operator of record

Gulf Sands Oil Co.

Permitted by Rincon Petroleum Corporation; the EWA schedule now lists a different operator.

Based in
Seagoville, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 9, 1994
Permits on file
82
Phone
(972) 476-9044

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRincon Petroleum Corporation
Production reportsGulf Sands Oil Co.through Apr 1993
Latest permitRincon Petroleum CorporationJun 21, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
3
permits on file
Jun 21, 1988
last permit issued
May 26, 1988
completed
0
cumulative oil, bbl
1.49K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 26, 1988
Shut in
—
Plugged
Aug 20, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hanus, Louise G-2-128066Tynan (1700)Gulf Sands Oil Co.101.49KJan 1993 – Aug 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gulf Sands Oil Co.Jan 1993 → Apr 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
347901-99RecompletionRincon Petroleum CorporationJun 17, 1988Jun 21, 1988—4,808
274114-99RecompletionRincon Petroleum CorporationMay 2, 1985May 3, 1985—4,808
224033-99DrillRincon Petroleum CorporationDec 19, 1983Dec 22, 1983Feb 8, 19845,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 26, 1988Hanus Louise G-2-128066Tynan (1700)Gulf Sands Oil Co.Plugged—
May 10, 1985Hanus Louise G-2-116552Tynan (Frio 2200)Rincon Petroleum CorporationPlugged—
Mar 5, 1984Hanus Louise G-2-110423Tynan (3600)Rincon Petroleum CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 179 ft elevation.Download CSV →

FormationMD ftSubsea
Het2,590-2,411
FrioBASAL FRIO (VICKSBURG)4,200-4,021
VicksburgVICKSBURG (BASAL FRIO)4,200-4,021

Perforations

Perforated and open-hole intervals.

FromToType
1,7001,703Perforated
2,2002,236Perforated
3,6163,624Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62566712.25220 S
4.54,8027.8751,035 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 23, 1988Jun 16, 1988Yes
00Aug 20, 1988——
00Jun 13, 1985May 17, 1985—
00Jun 5, 1985——
00Jun 7, 1984Apr 25, 1984—
00May 31, 1984Apr 25, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02532090, documented in the API reference.