TEXAS · WELLS · BEE COUNTY · ZERR, M. J. LEASE · API 42-025-32174 · DISTRICT 02
Zerr M. J. #1
Bee County · Papalote (4270) field · Vertical
- Fields on the latest permit · any of 4
- Field 69043284 · Field 69043426 · Papalote (4500) · Field 69043710
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
Zerr M. J. #1 (API 42-025-32174) is a plugged well in Bee County, plugged August 16, 1991, last operated by Regional Exploration Inc..
The RRC has issued one drilling permit, issued July 25, 1984, permitted to 4,750 ft.
Operator of record
- Based in
- Victoria, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jun 9, 1986
- Permits on file
- 3
- Phone
- (512) 573-0001
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Regional Exploration Inc. |
| Production reports | none |
| Latest permit | Regional Exploration, Inc.Jul 25, 1984 |
- 4,750
- total depth, ft
- 1
- permits on file
- Jul 25, 1984
- last permit issued
- Sep 20, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 20, 1984
- Shut in
- —
- Plugged
- Aug 16, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Zerr, M. J. O-2-6793 | Papalote (4270) | Regional Exploration, Inc. | 1 | 0 | 0 | by Jan 1993 – — |
No volumes reported on these leases in the last three years.
Wells named Zerr M. J.
Regional Exploration Inc.'s other wells filed under this lease name in Bee County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsPermits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 246085-99 | Drill | Regional Exploration, Inc. | Jul 24, 1984 | Jul 25, 1984 | Aug 9, 1984 | 4,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 20, 1984 | Zerr M. J. O-2-6793 | Papalote (4270) | Regional Exploration Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,269 | 4,271 | Perforated |
| 4,274 | 4,278 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 380 | 12.25 | 180 S |
| 4.5 | 4,764 | 7.875 | 882 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 26, 1984 | Oct 22, 1984 | — |
| 00 | Nov 8, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-32174 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-32174 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02532174, documented in the API reference.