WELL · 42-025-33335 · DISTRICT 2

Traylor #1

Plugged

Bee County · Heard Ranch Central (U. Yegua) field  · Vertical

Traylor #1 (API 42-025-33335) is a plugged well in Bee County, plugged January 8, 2009, last operated by Welder Exploration & Prod. Inc..

The RRC has issued one drilling permit, issued May 3, 2005, permitted to 7,000 ft.

Completion filings report one formation top, including U Yegua.

Operator of record

Welder Exploration & Prod. Inc.

Based in
San Antonio, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 9, 2023
Permits on file
346
Phone
(210) 354-1515

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWelder Exploration & Prod. Inc.
Production reportsnone
Latest permitWelder Exploration & Prod., Inc.May 3, 2005
7,000
total depth, ft
1
permits on file
May 3, 2005
last permit issued
Jul 24, 2006
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2006 THROUGH Jan 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 24, 2006
Shut in
—
Plugged
Jan 8, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Traylor G-2-221812Heard Ranch Central (U. Yegua)Welder Exploration & Prod., Inc.100Jul 2006 – Jan 2009

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
600094-99DrillWelder Exploration & Prod., Inc.May 2, 2005May 3, 2005Mar 3, 20067,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-221812————

Formation tops

As filed on W-2/G-1. Subsea from 160 ft elevation.Download CSV →

FormationMD ftSubsea
U Yegua6,300-6,140
U Yegua6,500-6,340

Perforations

Perforated and open-hole intervals.

FromToType
6,3426,346Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,22312.25442 S
74,8508.5277 S
4.56,5006.25160 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 8, 2007Sep 22, 2006Yes
00Nov 20, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02533335, documented in the API reference.