WELL · 42-025-33399 · DISTRICT 2

Collier #7

Plugged

Bee County · Norbee S.E. (4230) field  · Vertical

Collier #7 (API 42-025-33399) is a plugged well in Bee County, plugged March 3, 2010, last operated by Enco Exploration Company.

The RRC has issued one drilling permit (amended once), issued April 11, 2006, permitted to 6,000 ft.

Completion filings report 2 formation tops, including Lucille, Hockley.

Its lease has reported 4.48K barrels of oil and 6.38K mcf of gas since May 2006, last reporting in May 2010.

Operator of record

Enco Exploration Company

Based in
Corpus Christ, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 19, 2020
Permits on file
204
Phone
(361) 882-6100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnco Exploration Company
Production reportsEnco Exploration Companythrough May 2009
Latest permitEnco Exploration CompanyApr 11, 2006
6,000
total depth, ft
2
permits on file
Apr 11, 2006
last permit issued
Jul 1, 2006
completed
4.48K
cumulative oil, bbl
6.38K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2006 THROUGH May 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 2006
Shut in
—
Plugged
Mar 3, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Collier O-2-9085Norbee, S.E. (4230)Enco Exploration Company14.48K6.38KMay 2006 – May 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enco Exploration CompanyMay 2006 → May 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
617172-98DrillEnco Exploration CompanyJul 31, 2006Apr 11, 2006May 2, 20066,000
617172-99DrillEnco Exploration CompanyApr 6, 2006Apr 11, 2006May 2, 20066,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-9085————

Formation tops

As filed on W-2/G-1. Subsea from 281 ft elevation.Download CSV →

FormationMD ftSubsea
Lucille3,576-3,295
Hockley3,768-3,487

Perforations

Perforated and open-hole intervals.

FromToType
4,2564,263Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62553812.25235 S
4.54,4987.875930 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 6, 2007Jul 31, 2006Yes
00Dec 14, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02533399, documented in the API reference.