WELL · 42-025-33413 · DISTRICT 2

Green Helen #1

Y

Bee County · Garden (Middle Wilcox) field · Producing  · Vertical

Green Helen #1 (API 42-025-33413) is a well in Bee County operated by Vision Oil And Gas LLC, completed November 1, 2006 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) in 2006, permitted to 12,000 ft.

It was permitted by Hughes, Dan A. Company, L.P. and has since transferred to Vision Oil And Gas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Yegua, Cook Mtn, Queen City, Reklaw.

No lease production has been reported under this well’s leases.

Operator of record

Vision Oil and Gas LLC

Permitted by Hughes, Dan A. Company, L.P.; the EWA schedule now lists a different operator.

Based in
Laredo, TX
P-5 status
Delinquent (D)
P-5 last filed
Jun 16, 2025
Permits on file
6
Phone
(956) 728-7257

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVision Oil and Gas LLC
Production reportsVision Oil and Gas LLCthrough Jul 2021
Latest permitHughes, Dan A. Company, L.P.Dec 22, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
3
permits on file
Dec 22, 2006
last permit issued
Nov 1, 2006
completed
0
cumulative oil, bbl
269K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 1, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Green, Helen G-2-222200Causey (11,100)Vision Oil and Gas LLC1047.8KSep 2006 – Jul 2026
Green, Helen G-2-224274Garden (Middle Wilcox)Vision Oil and Gas LLC10221KNov 2006 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hughes, Dan A. Company, L.P.Sep 2006 → Jan 2017
  2. 2Vision Oil and Gas LLCFeb 2017 → Jul 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
630351-99RecompletionHughes, Dan A. Company, L.P.Dec 11, 2006Dec 22, 2006Oct 30, 200611,500
622412-98DrillHughes, Dan A. Company, L.P.Sep 25, 2006Jul 12, 2006Jul 21, 200612,000
622412-99DrillHughes, Dan A. Company, L.P.Jul 12, 2006Jul 12, 2006Jul 21, 200612,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-222200————
—— G-2-224274————

Formation tops

As filed on W-2/G-1. Subsea from 372 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua3,462-3,090
Cook MTN4,010-3,638
Queen City5,960-5,588
Reklaw6,785-6,413
Slick6,932-6,560
Luling7,053-6,681

Perforations

Perforated and open-hole intervals.

FromToType
10,41810,444Perforated
10,86210,878Perforated
10,93310,947Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,52014.751,480 S
7.6259,1619.875380 S
4.511,3056.5285 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 1, 2007Dec 12, 2006Yes
00Mar 28, 2007Sep 22, 2006Yes
00Feb 5, 2007——
00Nov 28, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02533413, documented in the API reference.