WELL · 42-025-33657 · DISTRICT 2
Tostenson Gas Unit #3
Bee County · Normanna (Hockley 3525) field · Vertical
Tostenson Gas Unit #3 (API 42-025-33657) is a well in Bee County operated by Wagner Oil Company, completed December 22, 2009.
The RRC has issued 2 drilling permits between 2009 and 2013, permitted to 3,700 ft.
Completion filings report 3 formation tops, including Hockley, Hockley 3100, Hockley 3525.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 23, 2025
- Permits on file
- 278
- Phone
- (817) 335-2222
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wagner Oil Company |
| Production reports | Wagner Oil Companythrough Jun 2017 |
| Latest permit | Wagner Oil CompanyOct 21, 2013 |
- 3,700
- total depth, ft
- 2
- permits on file
- Oct 21, 2013
- last permit issued
- Dec 22, 2009
- completed
- 0
- cumulative oil, bbl
- 125K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 22, 2009
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tostenson Gas Unit G-2-273603 | Tuleta, West (Hockley 3100) | Britanco, L.L.C. | 1 | 0 | 75.3K | Oct 2013 – Jul 2026 |
| Tostenson Gas Unit G-2-254914 | Normanna (Hockley 3525) | Wagner Oil Company | 1 | 0 | 50.1K | Dec 2009 – Jan 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wagner Oil CompanyDec 2009 → Jun 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 771738-99 | Recompletion | Wagner Oil Company | Oct 14, 2013 | Oct 21, 2013 | Oct 8, 2013 | 3,700 |
| 681441-99 | Drill | Wagner Oil Company | May 20, 2009 | May 22, 2009 | Sep 7, 2009 | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-254914 | — | — | — | — |
| — | — G-2-273603 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 289 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Hockley | 3,100 | -2,811 |
| Hockley 3100 | 3,100 | -2,811 |
| Hockley 3525 | 3,442 | -3,153 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,258 | 3,262 | Perforated |
| 3,442 | 3,448 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 508 | 12.25 | 230 S |
| 7.875 | 3,673 | 5.5 | 495 S |
| 5.5 | 3,673 | 7.875 | 495 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 24, 2014 | Jan 27, 2014 | — |
| 00 | May 13, 2010 | Jan 25, 2010 | Yes |
| 00 | Mar 10, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-33657 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-33657 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02533657, documented in the API reference.